| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹9.7 L (4.83%)Admitted-Finance | ₹2.1 Cr+₹9.7 L (4.83%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MATRIEX SHELTERS L1 | MAHESWARAN J L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in Sand silt or other Loose soil wet sand or silt not under water light black cotton soil sandy loam ordinary soil except hard rock requiring blasting including shering and shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 Cm thick well rammed consolidated and depositing the surp less earth within compound in places shown by the departmental officers with all leads and lifts etc., complete. | 2,996.1 | m3 | 88.5 ₹2,65,154.85 Lowest | 90 ₹2,69,649 |
| 2.00 | Supplying and filling with stone dust in layers of not more than 15cm thick well rammed watered and compacted including cost and conveyance of sand and filling charges etc complete as per SS7&24–V,VI(S4)8 | 380 | m3 | 249 ₹94,620 Lowest | 261 ₹99,180 |
| 3.00 | Plain cement concrete of mix 1 : 4 : 8 ( one cement , Four sand and Eight aggregates ) using 40 mm ISS HBG metal for foundation and flooring, including , dewatering, if found necessary, and laid in layers of not more than 15 cm thick, well rammed and consolidated, including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc. completed as per standard specification and as directed by departmental officials | 375 | m3 | 4,733 ₹17,74,875 Lowest | 4,970 ₹18,63,750 |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For drain | 6,482.7 | 1M2 | 268.55 ₹17,40,929.09 Lowest | 280 ₹18,15,156 |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For culvert | 2,698 | 1M2 | 538 ₹14,51,524 Lowest | 565 ₹15,24,370 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1,011 | 1M3 | 6,083.5 ₹61,50,418.5 Lowest | 6,390 ₹64,60,290 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 18,590 | Kg | 87.3 ₹16,22,907 Lowest | 91 ₹16,91,690 |
| 9.00 | Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) | 357 | 1M3 | 7,496 ₹26,76,072 Lowest | 7,870 ₹28,09,590 |
| 10.00 | SFRC Manhole cover for drain works (from SOR 22-23) | 183 | Nos | 2,700 ₹4,94,100 Lowest | 2,835 ₹5,18,805 |
| 11.00 | Plastering with cement mortar (1:4) 12mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 1,624 | 1M2 | 484.4 ₹7,86,665.6 Lowest | 510 ₹8,28,240 |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
19 May 2023, 3:00 pmClosed
Commissioner
Municipal Office, Ranipet Street, Attur, Salem District
Construction of Storm Water Drain and Culvert at Attur Municipal Limit
2023_MAWS_312739_1
4797/2023/E1
Open Tender
Civil Works
Works
180 days
Attur Municipal Limit
Please Refer Tender Document
3 documents required · 3 mandatory
₹0
₹2.0 L
Attur Municipal Office
23 May 2023
9 May 2023
19 May 2023
9 May 2023
19 May 2023
9 May 2023
10 May 2023
Amount
Earth work excavation in Sand silt or other Loose soil wet sand or silt not under water light black cotton soil sandy loam ordinary soil except hard rock requiring blasting including shering and shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 Cm thick well rammed consolidated and depositing the surp less earth within compound in places shown by the departmental officers with all leads and lifts etc., complete.
Supplying and filling with stone dust in layers of not more than 15cm thick well rammed watered and compacted including cost and conveyance of sand and filling charges etc complete as per SS7&24–V,VI(S4)8
Plain cement concrete of mix 1 : 4 : 8 ( one cement , Four sand and Eight aggregates ) using 40 mm ISS HBG metal for foundation and flooring, including , dewatering, if found necessary, and laid in layers of not more than 15 cm thick, well rammed and consolidated, including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc. completed as per standard specification and as directed by departmental officials
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For drain
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For culvert
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials)
SFRC Manhole cover for drain works (from SOR 22-23)
Plastering with cement mortar (1:4) 12mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Goods and Service Tax @ 18%
MAHESWARAN J
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BID.pdf
Tender Documents • 0.81 MB
BOQ_371176.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .