| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC MIRDHAN KIRATPUR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹13.3 L+₹563.85 (0.04%)Accepted-AOC | L2 | Accepted-AOC REJECTED |
Tender Value
₹13.8 L
EMD Value
₹28,000
Closing Date
17 Dec 2021, 9:00 amClosed
E.E. MGCD-7 Bijnor
bijnor
const. of canal from km.2.160 to km. 2.200 and D.R.B.At km.2.177 of mandanpur minor.
2021_UPIDC_654610_13
03/EE/2021-22
Open Tender
Civil Works
Item Wise
sambhal
tender document
4 documents required · 4 mandatory
₹354
₹28,000
Yes
6 Sept 2022
11 Dec 2021
17 Dec 2021
11 Dec 2021
17 Dec 2021
11 Dec 2021
Amount
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, royalty and all taxes complete as per directed by Engineer-in-Charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete in 1:3:6 including all cost of material, labour , T&P etc. for completion of work per cum.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. Per cum
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. per Sqm.
For RCC work
For RCC work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work. R/M
Supply and laying Tarfelt sheet in two layers on Bed Block including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete. Per No..
Earth work in filling in Ramp and diversion including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete. Per No..
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete. Per No..
MOHAMMAD AWAIS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .