Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC GEEJGARH ROAD SIKANDRA SIKANDRA CHORAHA SIKANDRA DAUSA RAJASTHAN 303326 UDYAM RJ 12 0005159 | DAUSA | RAJASTHAN | 303326 | ₹4.7 Cr | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 Contractor, Ms. Mahalaxmi Construction Company, Haryana at their revised quoted total amount of Rs. 4,66,20,394.14 /- for the subject work. |
| 2 | L2₹5.2 Cr+₹52.5 L (11.2%)Rejected-Finance | ₹5.2 Cr+₹52.5 L (11.2%) | L2 | Rejected-Finance Being L2 Contractor. Not Accepted. |
| 3 | L3₹5.7 Cr+₹98.1 L (21.0%)Rejected-Finance | ₹5.7 Cr+₹98.1 L (21.0%) | L3 | Rejected-Finance Being L3 Contractor. Not Accepted. |
| Sl No | Description | Qty | Unit | MAHALAXMI CONSTRUCTION COMPANY L1 | NARASIMHAN ENGINEERING CONTRACTORS PRIVATE LIMITED L3 | HARI ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolitionof Existing old dilapilated building of any size , shape of any material and removing the Serviceable useable materials seperately by dissmantling without making any damage and handing over the same to CE Estate store and demolshing the brickwork , concrete etc., and clearing the rubbish including the foundation part copletely without leaving any construction materials below the ground level. The rate is inclusve of shifting the debris to al lead exceeding 1.5 Km from the site and dumping , the materials at the low lying area including levelling the surface after dumping to have a uniform levellled surface. | 1,000 | SqM | 180 ₹1,80,000 Lowest | 220 ₹2,20,000 | 200 ₹2,00,000 |
| 2.00 | Demolition of Brick work built in Cement Mortor of any description | 5 | CuM | 1,800 ₹9,000 | 1,850 ₹9,250 | 950 ₹4,750 Lowest |
| 3.00 | Demolition of Reinforced Cement Concrete in of any thickness including plastering | 5 | CuM | 1,800 ₹9,000 | 2,850 ₹14,250 | 1,000 ₹5,000 Lowest |
| 4.00 | Demolition of Unreinforced cement concrete in of any thickness including plastering | 10 | CuM | 1,800 ₹18,000 | 3,850 ₹38,500 | 950 ₹9,500 Lowest |
| 5.00 | Dismantling structural steel work including doors, windows, ventilators, gates but excluding framed truss etc and handing over to CE store. | 2 | Per Quintal | 600 ₹1,200 Lowest | 5,000 ₹10,000 | 700 ₹1,400 |
| 6.00 | M & L for cutting down the branches and Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a distance n exc. 50 m and clearing site (girth exc 30 cm and n.exc. 100cm) | 6 | Each | 2,000 ₹12,000 Lowest | 10,000 ₹60,000 | 2,500 ₹15,000 |
| 7.00 | Surface excavation in Hard/Dense soil n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out | 3,000 | SQM | 100 ₹3,00,000 | 30 ₹90,000 Lowest | 70 ₹2,10,000 |
| 8.00 | Obtaining Reports for Soil investigation includes geotechnical investigation for the proposed project site to determine subsurface soil conditions for structural foundation design, based on the attached plan and elevation and structural Drawing should be provided by contractor .all as specified and directed. | 1 | WJ | 72,000 ₹72,000 Lowest | 75,000 ₹75,000 | 1,40,000 ₹1,40,000 |
| 9.00 | Earthwork excavation in hard/dense soil in trenches width and depth not exceeding 1.50 m and getting out | 1,730 | CUM | 450 ₹7,78,500 | 260 ₹4,49,800 Lowest | 650 ₹11,24,500 |
| 10.00 | Earth work excavation in trenches exceeding 1.5m and not exceeding 3.0 m in width and depth and getting out in hard/dense soil. | 65 | CUM | 540 ₹35,100 | 280 ₹18,200 Lowest | 900 ₹58,500 |
Tender Value
₹4.8 Cr
EMD Value
₹5.5 L
Closing Date
28 Oct 2025, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, HVF, AVADI, CHENNAI - 600 054
CONSTRUCTION OF 02 NOS. OF TYPE-VI QUARTERS AT AVNL ESTATE
2025_AVNL_250028_1
HVF/TE/13025/CEO/2025-26/43
Open Tender
Civil Works
Works
365 days
AVNL ESTATE
Details Enclosed
8 documents required · 8 mandatory
₹0
₹5.5 L
23 Dec 2025
23 Sept 2025
29 Oct 2025
23 Sept 2025
28 Oct 2025
23 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_286655.xls
BOQ • 0.50 MB
Corrigendum.pdf
PDF • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .