| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.6 LAccepted-Finance | ₹91.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹96.9 LAccepted-Finance | ₹96.9 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | S.SENTHAMARAIKANNAN L1 | P VIGNESH L2 |
|---|---|---|---|---|---|
| 1.00Providing scaffolding charges for Vimanam/Gopuram with steel posts non- flammable shade wherever necessary for main formwork and providing ladder arrangements, centering steel sheet for working inspection etc., complete as per standard specification. Hire charges for errection and maintenance and removing the same on completion of work upto various height | |||||
| 1.10 | Vimanam height up to 50' | 487 | Sq.m | 480 ₹2.3 L | 485 ₹2.4 L |
| 1.20 | Vimanam height up to 25' | 480 | Sq.m | 375 ₹1.8 L | 380 ₹1.8 L |
| 1.30 | Vimanam height up to 15' | 641 | Sq.m | 280 ₹1.8 L | 285 ₹1.8 L |
| 2.00 | Providing water washing to existing cutstone masonry work for the removal of lime wash on stone and other deposits like soot and enamel paints. | 4,505 | Sq.m | 40 ₹1.8 L | 45 ₹2.0 L |
| 3.00 | Pointing the stone joints with lime mortar 1:1.5 (one of lime, one and five of sand) after rackingout the stone joints including erection of scaffolding charges etc complete. | 4,259 | Sq.m | 308 ₹13.1 L | 350 ₹14.9 L |
| 4.00Scraping the decayed lime plaster from the surface of vimanam and gopurams, carefully including isolated bricks or brickwork without demaging the vari vargams, racking out the joints, cleaning the surface with water including working in heights hire charges for special tools, brushes complete superficial ared including all folds-100ft | |||||
| 4.10 | Vimanam height up to 50' | 4,508.44 | Sq.ft | 20 ₹90,168.80 | 25 ₹1.1 L |
| 4.20 | Vimanam height up to 25' | 2,582.4 | Sq.ft | 10 ₹25,824 | 11 ₹28,406.40 |
| 4.30 | Vimanam height up to 15' | 7,704.16 | Sq.ft | 10 ₹77,041.60 | 11 ₹84,745.76 |
Tender Value
₹92.1 L
EMD Value
₹56,500
Closing Date
13 Mar 2026, 1:00 pmClosed
Executive Officer
Executive Officer, Arulmigu Soleeswarar Temple, Vikaramangalam, Udaiyarpalayam Taluk, Ariyalur District - 621701.
Repairs and Renovation of All Sannathies and Re-Construction of Madhil wall in Arulmigu Soleeswarar Temple, Vikramangalam, Udaiyarpalaiyam taluk, Ariyalur District.
2026_HRCE_667457_1
1596758/2025/Q5
Open Tender
Civil Works
365 days
Vikaramanagalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹56,500
13 Mar 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
13 Mar 2026
27 Feb 2026
Providing scaffolding charges for Vimanam/Gopuram with steel posts non- flammable shade wherever necessary for main formwork and providing ladder arrangements, centering steel sheet for working inspection etc., complete as per standard specification. Hire charges for errection and maintenance and removing the same on completion of work upto various height
Vimanam height up to 50'
Vimanam height up to 25'
Vimanam height up to 15'
Providing water washing to existing cutstone masonry work for the removal of lime wash on stone and other deposits like soot and enamel paints.
Pointing the stone joints with lime mortar 1:1.5 (one of lime, one and five of sand) after rackingout the stone joints including erection of scaffolding charges etc complete.
Scraping the decayed lime plaster from the surface of vimanam and gopurams, carefully including isolated bricks or brickwork without demaging the vari vargams, racking out the joints, cleaning the surface with water including working in heights hire charges for special tools, brushes complete superficial ared including all folds-100ft
Vimanam height up to 50'
Vimanam height up to 25'
Vimanam height up to 15'
Scraping the dust,pasi and old paint from the surface of Kalkaram carefully including isolated bricks of brickwork without damaging the varivargam racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes etc, complete.
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m high , Including all meterials and labour charges etc., Pg No 27,Unique Code W-0015 (283.14) Cu.m
Removal of Weathering Course and Pressed Tiles Including all Materils and Labour Charges ect., Pg No 28,Unique Code W-0037 (45.98)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Brick work using Country Bricks of size 8-3/4" x 4-1/4" X2-3/4"" in Cement Mortar 1:5 (One cement and five crushed stone sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Dismantling of Brick / Stone Masonry in lime mortar walls under 3m high , Including all meterials and labour charges etc., Pg No 27,Unique Code W-0013 (231) Cu.m
Ornamental Brick work in LM 1:2 mix using II Class ground Moulded Chamber Burnt Bricks of size 9" x 43/8" x 23/4"all vari vargams, moulds, sthambas,mukapatram,koodu,nasi,and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete in cluding cement al labour chagers
Vimanam height up to 50'
Providing vargapoochu over the core walls of vimanams/Gopurams, with lime mortar 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with lime mortar 1:1.5 and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram.
Vimanam height up to 50'
Vimanam height up to 25'
Vimanam height up to 15'
Numbering and Removing carefully the stone memebers like wall and pavukkal including all labour charges etc complete complying with standard specification
Clean Removal of Brick on Edge Floor , Including all meterials and labour charges etc., Pg No 27,Unique Code W-0013 (231) Cu.m
Removal of plain cement concrete and Including all Materils and Labour Charges ect., Pg No 28,Unique Code W-0034 (486.20)
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Refixing the cut stone memebers like wall and pavukkal including all labour charges etc complete complying with standard specification
Brick on edge flooring over a bed of concrete 100 mm thick and pointed with Lime Mortar 1:2 including cost of all materials and labour charges for laying etc., complete as per th standard specification.
Paving with cut stone flooring using cut stone of size600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges. Outer
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the cutstone slab in a single layer of required slope and finished by beating the lime concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime mortar 1:1.5 (One Lime, One and Half of Five Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Painting with Single colour (Yegavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials, labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft
Painting two coats of newly plastered wall surface with ready mixed water based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing ornamental teak wood temple pattern door of following size with four leaves as per the drawing approved by the departmental officer. The outer frames are four horizontal and two vertical santling. Shutter frame are two scantling.The panel shall have 20mm thick best and approved quality teak wood plank. the shutter shall be equal planks. the rate including cost of the best quality teak wood, Brarees Hinges, Tower bolts, Air drops ornamental Handles. The door frame and Shutter gives two coat best quality synthetic enamel paint.
Above 7' height
Below 7' height
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Sub total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_801843.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 2.75 MB
TenderCondition.pdf
Tender Documents • 2.74 MB
BOQ_801843.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid