Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.7 LAdmitted-Finance A 24 PATRAKAR COLONY ASHOK NAGAR ALLAHABAD UTTAR PRADESH 211001 | PRAYAGRAJ | UTTAR PRADESH | 211001 | L1 | Admitted-Finance | ||
| 2 | L2₹15.0 L+₹1.3 L (9.71%)Admitted-Finance MUZAFFARNAGAR MEERUT ROAD GEHRA BAGH OPP PWD WARE HOUSE MUZAFFARNAGAR UTTAR PRADESH 251002 | MUZAFFARNAGAR | UTTAR PRADESH | 251002 | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical MOHIUDDENPUR DANDUPUR KARCHHANA ALLAHABAD UTTAR PRADESH 211008 | PRAYAGRAJ | UTTAR PRADESH | 211008 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹13.8 L
EMD Value
₹17,000
Closing Date
16 Mar 2026, 1:00 pmClosed
SE ETC Mathura
132 KVS/S Aurangabad Mathura
Work of Revetment on Tower No. 19 of 132 KV Meetai-Odpura-II D/C Line under ETD Hathras
2026_UPTCL_1112814_1
ET-63/ETC(M)/25-26
Open Tender
Electrical Works
Lump-sum
90 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ATT ETC Mathura
₹17,000
27 Apr 2026
5 Feb 2026
17 Mar 2026
5 Feb 2026
16 Mar 2026
5 Feb 2026
Earth work in excavation in foundation in ordinary soil including lifting etc.
Cement concrete in ratio1:4:8 with cement coarse sand and 40mm brick ballast in foundation including the cost of all labour and material and T&P required for proper completion of work
First class brick work ratio 1:4 with cement and using coarse sand including cost of all labour and material and T&P required for proper completion of work
R.C.C. work in ratio 1:2:4 with cement coarse sand and 20mm size stone ballast foundation including the cost of all labour and material and T&P required for proper competion of work.
12mm thick plaster in ratio of 1:4 with cement and fine sand wigth proper finishing and all labour and material and T&P required for proper completion of work.
Filling of earth under the floor and cavity back filling including the cost of earth obtained from outside the corporation area for proper completion of work including filling and leveling etc.
First class brick work, soiling of flooring which including laying of brick and flat edge filling with sand in between the joints including preparation of base for laying of bricks including cost of all labour and material and T&P required proper completion of work.
Tor steel for RCC work such as reinforced cencrete or reinforced brick work (when not including in over all rates) wrought to required shape as necessary included bending for proper completion of work and including supply of 12 mm steel and macking its bend, beam, and authorized overlapping as required for proper completion of the work. and 8 mm Mildsteel (Extra Bar) for ring.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_2058737.xls
BOQ • 0.24 MB
NITF.pdf
Tender Documents • 0.98 MB
lext1.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .