Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
25 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Mini Sectt Bandipore
Const of FP work on LS of Hudbal Nallah near house of Sameem Ahmad Bhat at Ahamsharief
2021_IFC_120779_2
E-NIT 32 of 2020-2021
Open Tender
Civil Works
Item Rate
21 days
Bandipore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
26 Mar 2021
18 Mar 2021
26 Mar 2021
18 Mar 2021
25 Mar 2021
18 Mar 2021
120 days
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Providing and laying stone soling in horizontal on level ( labour only)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: (a). Retaining walls, return walls, walls (any thickness) including attached pilasters resses, plinth and string course fillets, kerbs and steps etc.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Supply of stones
Carriage of materials by mechanical transport from divisional store to road site of work including loading unloading and stacking : Stone soling from Sonerwane for an av lead of 05 Km
40mm aggregate for an av lead of 35 Km
20mm aggregate for an av lead of 35 Km
Sand from Hajin for an av lead of 30 Km
Cement from divisional store for an av lead of 10 Km
FAROOQ AHMAD KHAN
MUDASIR AHMAD ZARGAR
M/s Aabid Hussain Dar
M/s Abdul Rashid Najar
M/S GH AHMAD TANTRAY
M/s Nisar Ahmad Malik
GHULAM MOHD WANI
M/s Nazir Ahmad Sofi
stage.html
html • 0.03 MB
finance_232344.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .