Tender Value
₹43.2 L
EMD Value
₹86,400
Closing Date
1 Sept 2026, 11:15 am
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV Construction of Haudies and all other allied works.
2026_DOA_173874_1
DSWC/SAN/2026-27/24
Open Tender
Pipe Laying Works
Percentage
180 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹1,500
₹86,400
19 Aug 2026
19 Aug 2026
1 Sept 2026
19 Aug 2026
1 Sept 2026
19 Aug 2026
FINANCIAL BID NO.: DSWC/SAN/2026-2027/24
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Bijalpur and Akbarpur (C/o 10283/TF (Ext.), Tehsil-Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 9890.1 /Cum 93.78 Rupees Ninty three and seventy eight paise only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 71 Rupees Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2664 /Joints 208.05 Rupees Two Hundered Eight and Five Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 20 /Meter 2777.03 Rupees Two Thousand Seven Hundered Seventy Seven and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 57 /Cut hole 105 Rupees One Hundered Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 27 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 57 /Riser & Valve 705.43 Rupees Seven Hundered Five and Forty Three Paise Onlly
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 27 /Air pipe 287.09 Rupees Two Hundered Eighty Seven and Nine Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3865.31 Rupees Three Thousand Eight Hundred Sixty Five and Thirty One Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5090.53 Rupees Five Thousand Ninty and Fifty Three Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5618.29 Rupees Five Thousand Six Hundered Eighteen and Twenty Nine Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.81 Rupees Two Hundred One and Eighty One Paise Only
RCC Slab 1:2:4 0.21 cum 8188.25 Rupees Eight Thousand One Hundred Eighty Eight and Twenty Five Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Nine Haudis
Estimate of Charges for pump stand 900mm
S&S Pump Stand 1200mm(3Mtr) 9 Nos
Material For Fixing of P.S:-
Cement 2 Nos 300 Rupess Three Hundred Only
Sand 9 Cft 37.22 Thirty Seven Rupees and Twenty Two Paise Only
Aggrigate 15 Cft 37.91 Thirty Seven Rupees and Ninty One Paise Only
Labour for installation of P.S 1 No 2079 Two Thousand Seventy Nine Rupees
Foundation Of Pump Stand (1:8:16) Dimension (2*2*0.15m)
Cement 1.08 Bags 300 Three Hundred
Sand 10.6 Cft Thirty Seven Rupees and Twenty Two Paise Only
Aggrigate 21.18 Cft Thirty Seven Rupees and Ninty One Paise Only
1:8:16 Labour 0.6 Cft 1269.47 One Thousand Two Hundred Sixty Nine Rupees and Fourty Seven Paise Only
Excavation(2*2*2) 8 Cft 93.78 Ninety Three Rupees and Seventy Eight Paise Only
Total Cost for Nine Pump Stand
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (600 mm) 12 each 2050.44 Rupees Two Thousand Fifty and Forty Four Paise Only
Nimar for jointing the pipe (600mm) 367.632 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 657.092 per tonnes 172.94 Rupees One Hundered Seventy Two and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Ubhia (C/o 8511/R (Ext.), Tehsil-Dirba and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1254.83 /Cum 93.78 Rupees Ninty three and seventy eight paise only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 71 Rupees Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 338 /Joints 208.96 Rupees Two Hundered Eight and Ninty Six Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2777.03 Rupees Two Thousand Seven Hundered Seventy Seven and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 10 /Cut hole 105 Rupees One Hundered Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 10 /Riser & Valve 712.88 Rupees Seven Hundered Twelve and Eighty Eight Paise Onlly
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 4 /Air pipe 290.33 Rupees Two Hundered Ninty and Thirty Three Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3865.31 Rupees Three Thousand Eight Hundred Sixty Five and Thirty One Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5090.53 Rupees Five Thousand Ninty and Fifty Three Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5618.29 Rupees Five Thousand Six Hundered Eighteen and Twenty Nine Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.81 Rupees Two Hundred One and Eighty One Paise Only
RCC Slab 1:2:4 0.21 cum 8188.25 Rupees Eight Thousand One Hundred Eighty Eight and Twenty Five Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Zero Haudis
Estimate of Charges for pump stand 900mm
S&S Pump Stand 1000mm(3Mtr) 2 Nos
Material For Fixing of P.S:-
Cement 2 Nos 300 Rupess Three Hundred Only
Sand 9 Cft 38.51 Thirty Eight Rupees and Fifty One Paise Only
Aggrigate 15 Cft 39.21 Thirty Nine Rupees and Twenty One Paise Only
Labour for installation of P.S 1 No 2079 Two Thousand Seventy Nine Rupees
Foundation Of Pump Stand (1:8:16) Dimension (2*2*0.15m)
Cement 1.08 Bags 300 Three Hundred
Sand 10.6 Cft Thirty Eight Rupees and Fifty One Paise Only
Aggrigate 21.18 Cft Thirty Nine Rupees and Twenty One Paise Only
1:8:16 Labour 0.6 Cft 1269.47 One Thousand Two Hundred Sixty Nine Rupees and Fourty Seven Paise Only
Excavation(2*2*2) 8 Cft 93.78 Ninety Three Rupees and Seventy Eight Paise Only
Total Cost for Two Pump Stand
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Fixing of gate valve (600 mm) 2 each 2057.89 Rupees Two Thousand Fifty Seven and Eighty Nine Paise Only
Nimar for jointing the pipe (600mm) 46.644 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 83.692 per tonnes 172.94 Rupees One Hundered Seventy Two and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Shadihari (C/o 79790/L), Tehsil-Dirba and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5916.6 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 70 Rupee Seventy Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2076 /Joints 91.55 Rupees Ninty One and Fifty Five Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (250 mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 989.24 Rupees Nine Hundered Eighty Nine and Twenty Four Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (250 mm) 51 /Cut hole 62 Rupees Sixty Two Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 18 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (250 mm) 51 /Riser & Valve 440.21 Rupees Four Hundred Forty and Twenty One Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 18 /Air pipe 290.33 Rupees Two Hundred Ninty and Thirty Three Paise Only
Fixing of Gate valves with C.C 1:2:4 (250 mm) 13 /Gate Valve 1226.12 Rupees One Thousand Two Hundered Twenty Six and Twelve Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3888.09 Rupees Three Thousand Eight Hundred Eighty Eight and Nine Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5152.69 Rupees Five Thousand One Hundered Fifty Two and Sixty Nine Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5629.7 Rupees Five Thousand Six Hundered Twenty Nine and Seventy Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.56 Rupees Two Hundred Two and Fifty Six Paise Only
RCC Slab 1:2:4 0.21 cum 8244.94 Rupees Eight Thousand Two Hundred Forty Four and Ninty Four Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Three Haudis
Estimate of Charges for pump stand 900mm
S&S Pump Stand 900mm(3Mtr) 8 Nos
Material For Fixing of P.S:-
Cement 2 Nos 300 Rupess Three Hundred Only
Sand 9 Cft 38.51 Thirty Eight Rupees and Fifty One Paise Only
Aggrigate 15 Cft 39.21 Thirty Nine Rupees and Twenty One Paise Only
Labour for installation of P.S 1 No 2079 Two Thousand Seventy Nine Rupees
Foundation Of Pump Stand (1:8:16) Dimension (2*2*0.15m)
Cement 1.08 Bags 300 Three Hundred
Sand 10.6 Cft Thirty Eight Rupees and Fifty One Paise Only
Aggrigate 21.18 Cft Thirty Nine Rupees and Twenty One Paise Only
1:8:16 Labour 0.6 Cft 1269.47 One Thousand Two Hundred Sixty Nine Rupees and Fourty Seven Paise Only
Excavation(2*2*2) 8 Cft 93.78 Ninety Three Rupees and Seventy Eight Paise Only
Total Cost for Eight Pump Stand
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 134.94 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 287.974 Ton 160.3 Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Laadbanjara Kalan (C/o 5932/L), Tehsil-Dirba and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 96.9 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 34 /Joints 117.33 Rupees One Hundred Seventeen and Thirty Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 1 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 0 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) 1 /Riser & Valve 491.07 Rupees Four Hundred Ninty One and Seven Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 0 /Air pipe 289.88 Rupees Two Hundred Eighty Nine and Eighty Eight Paise Only
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 2.67 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 4.795 Ton 160.3 Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Grand Total (A+B+C+D)
Credit of Damaged lined water channel existing on site to be deducted from the bill of Agency 0
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
NITUGPL262724.pdf
Tender Documents • 0.52 MB
DNITUGPL262724.pdf
Tender Documents • 1.18 MB
FBUGPL262724.xls
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].