Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-AOC HARIPUR COLLIERY P O HARIPUR DIST PASCHIM BARDHAMAN PIN 713378 W B | HARIPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | Rejected-Technical VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | - | Rejected-Technical Technically not eligible | |
| 3 | Rejected-Technical HARIPUR BARDHAMAN BARDHAMAN 713323 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713323 | - | Rejected-Technical Technically not eligible |
| Sl No | Description | Qty | Unit | SANJAY YADAV L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 1.01Material Cost | ||||
| 1.02 | Cost of Cutting Rod (Spectrum 28A) 4mmX450mm. | 120 | Kg | 400 ₹48,000 Lowest |
| 1.03Labour Cost:- | ||||
| 1.04 | Dismantling of 6" dai MS Pipe (Horizontal). | 3,500 | Mtr | 43 ₹1,50,500 Lowest |
| 1.05 | Dismantling of 6" dai MS Pipe (Verticle). | 600 | Mtr | 106 ₹63,600 Lowest |
| 1.06 | Handling, loading & unloading 6" dai MS Pipe. | 4,100 | Mtr | 36.75 ₹1,50,675 Lowest |
| 1.07 | Dismantling of 8" dai MS Pipe (Horizontal). | 1,800 | Mtr | 54 ₹97,200 Lowest |
| 1.08 | Dismantling of 8" dai MS Pipe (Verticle). | 200 | Mtr | 128 ₹25,600 Lowest |
| 1.09 | Handling, loading & unloading 8" dai MS Pipe. | 2,000 | Mtr | 53 ₹1,06,000 Lowest |
Tender Value
₹8.8 L
EMD Value
₹11,000
Closing Date
19 Jun 2025, 5:00 pmClosed
AE EnM
Sonepur Bazari Area
Dismantling, Handling, loading and unloading of 6inch dia (about 4100 Mtr) and 8inch dia (2000 Mtr) M.S. Pipeline under S. B. Project.
2025_ECL_337090_1
GM/SBA/EnM/Tender/25-26/26
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Sonepur Bazari Area
Please refer tender documents.
4 documents required · 4 mandatory
₹11,000
15 Oct 2025
7 Jun 2025
21 Jun 2025
9 Jun 2025
19 Jun 2025
9 Jun 2025
9 Jun 2025 - 12 Jun 2025
Amount
Item Description/ Heading
Material Cost
Cost of Cutting Rod (Spectrum 28A) 4mmX450mm.
Labour Cost:-
Dismantling of 6" dai MS Pipe (Horizontal).
Dismantling of 6" dai MS Pipe (Verticle).
Handling, loading & unloading 6" dai MS Pipe.
Dismantling of 8" dai MS Pipe (Horizontal).
Dismantling of 8" dai MS Pipe (Verticle).
Handling, loading & unloading 8" dai MS Pipe.
Add Tools & tackels (10% of labour+ Material cost) @ 10%.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .