| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance | -27.99% | ₹23.8 L | L1 | Admitted-Finance |
| 2 | L2₹24.1 L+₹24,481.36 (1.03%)Admitted-Finance | -27.25% | ₹24.1 L+₹24,481.36 (1.03%) | L2 | Admitted-Finance |
| 3 | L3₹24.2 L+₹33,082.92 (1.39%)Admitted-Finance | -26.99% | ₹24.2 L+₹33,082.92 (1.39%) | L3 | Admitted-Finance |
Tender Value
₹33.1 L
EMD Value
₹66,160
Closing Date
8 Jul 2026, 4:00 pmClosed
Executive Engineer PWD Rand B project Div 1 Jammu
ffice of the EE PWD Rand B project Div 1 Jammu
Construction of foot over bridge connecting NIA VWDC Court with Dome area at District court Jammu
2026_PWDJK_313349_1
e-NIT No. 13 of 2026-27 dated 23-06-2026
Open Tender
Civil Works
Percentage
court complex Janipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Rand B project Div 1 Jammu
₹66,160
Office of the EE PWD Rand B project Div 1 Jammu
11 Jul 2026
23 Jun 2026
9 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer incharge:1:3:6 or richer mix (i/c equivalent design mix) | 45.93 | CUM | 1,725.2 | ₹79,238.44 |
| 2 | Making the opening for door/window/clerestory window in brick masonry including dismantling in floor or walls by cutting masonry and making good the damages to walls, flooring and jambs complete, to match existing surface i/c disposal of mulba/ rubbish to the nearest municipal dumping ground. | 27 | CUM | 958.05 | ₹25,867.35 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in all kind of soil. | 84 | CUM | 187.3 | ₹15,733.2 |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 15 | CUM | 592.9 | ₹8,893.5 |
| 5 | Extra for every additional lift of 1.5 M or part therefore in all kinds of soil. | 24 | CUM | 89.75 | ₹2,154 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed. | 3.88 | CUM | 5,202.9 | ₹20,173.39 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 9.42 | CUM | 5,733.6 | ₹54,018.42 |
| 8 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)). | 12 | CUM | 5,733.6 | ₹68,803.2 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.6 | cum | 9,821.85 | ₹5,893.11 |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as perapproved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. All works upto plinth level. | 29.55 | CUM | 8,021.1 | ₹2,36,993.19 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1014146.xls
BOQ • 0.31 MB
extension.pdf
PDF • 0.53 MB
extensioniII.pdf
PDF • 0.19 MB
extension13.pdf
PDF • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .