Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹2.2 L Quoted ₹2.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹2.2 LRejected-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹2.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | PREETHI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling | 1 | No | 40,500 ₹40,500 | 39,600 ₹39,600 |
| 2.00 | Charges for Complete alignment & checking the operation of clarifier sludge disposal pump motor, sludge disposal pump and its suction & delivery pipe lines and its 150 mm gate valves. | 1 | No | 13,500 ₹13,500 | 13,150 ₹13,150 |
| 3.00 | Charges for Overhauling of 150 / 200 mm size, 1 No.125 mm NRV and 150 / 300 Class Gate valves of Cold & Hot water Tunnel Vent in Cooling Water system II including dismantling of vent pipe, complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling. | 11 | Nos | 8,500 ₹93,500 | 8,000 ₹88,000 |
| 4.00 | Charges for painting with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals for tunnel vent valves, air vent valves. | 37 | M² | 260 ₹9,620 | 250 ₹9,250 |
| 5.00 | Charges for cleaning and painting with one coat of Epoxy red oxide primer, Two coats of first quality epoxy grey paint of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars, drive shaft assembly and FRP fan blades in Cooling Tower-IV. | 255.2 | M² | 120 ₹30,624 | 110 ₹28,072 |
| 6.00 | Cost of Neoprene Rubber(Black) Gasket,Size, 1 M X 2 M X 5 MM thick For Sl.No.3 | 20 | Kgs | 105 ₹2,100 | 95 ₹1,900 |
| 7.00 | Cost of Rust Convertor For Sl.No.4 | 4 | Kgs | 210 ₹840 | 200 ₹800 |
| 8.00 | Cost of Epoxy Thinner For Sl.No.4 & 5 | 14 | Litre | 210 ₹2,940 | 200 ₹2,800 |
| 9.00 | Cost of Paint Epoxy red oxide primer for Sl.No.4 & 5 | 11 | Litre | 260 ₹2,860 | 250 ₹2,750 |
| 10.00 | Cost of Epoxy Coal tar paint For Sl.No.4 | 7 | Litre | 260 ₹1,820 | 250 ₹1,750 |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
25 Sept 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Unit III Overhauling and painting of Sludge Disposal Pump and Cold and Hot water Tunnel vent valves Air Vent valves Gate valves etc
2025_EB_602781_1
CE/MTPS-I/SE/M-I/CA/OT. 260/2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,100
Yes
15 May 2026
11 Sept 2025
26 Sept 2025
11 Sept 2025
25 Sept 2025
11 Sept 2025
Amount
Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling
Charges for Complete alignment & checking the operation of clarifier sludge disposal pump motor, sludge disposal pump and its suction & delivery pipe lines and its 150 mm gate valves.
Charges for Overhauling of 150 / 200 mm size, 1 No.125 mm NRV and 150 / 300 Class Gate valves of Cold & Hot water Tunnel Vent in Cooling Water system II including dismantling of vent pipe, complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling.
Charges for painting with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals for tunnel vent valves, air vent valves.
Charges for cleaning and painting with one coat of Epoxy red oxide primer, Two coats of first quality epoxy grey paint of I.D fan gearbox outer surfaces, hub & arm sleeves, Tie bars, drive shaft assembly and FRP fan blades in Cooling Tower-IV.
Cost of Neoprene Rubber(Black) Gasket,Size, 1 M X 2 M X 5 MM thick For Sl.No.3
Cost of Rust Convertor For Sl.No.4
Cost of Epoxy Thinner For Sl.No.4 & 5
Cost of Paint Epoxy red oxide primer for Sl.No.4 & 5
Cost of Epoxy Coal tar paint For Sl.No.4
Cost of Epoxy grey paint for Sl.No.5
Cost of Consumables and T & P For Sl.No.1 to 5
SS ENGINEERING CONTRACTOR (BID ID -1469703)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_720553.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid