| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.2 CrAdmitted-Finance 306 B 2 SOUTH BLOCK BAHU PLAZA JAMMU 180004 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180004 | L1 | Admitted-Finance | ||
| 2 | L2₹14.4 Cr+₹27.6 L (1.95%)Admitted-Finance LASJAN BYE PASS SRINAGAR J K 191101 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 191101 | L2 | Admitted-Finance | ||
| 3 | L3₹14.6 Cr+₹45.5 L (3.22%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹15.0 Cr+₹82.9 L (5.86%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical Non-responsive |
Tender Value
₹20.0 Cr
EMD Value
₹40.0 L
Closing Date
15 Oct 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Four Laning of Boulevard Road from Nehru Park to Kralsangri RD 2000 to RD7000 (Balance Portion)
2025_PWDJK_290768_1
Nit-48.of RNB/7445-48/2025-26 dtd.03-10-2025
Open Tender
Civil Works
Percentage
730 days
Boulevard Road from Nehru Park to Kralsangri
As per nit
8 documents required · 8 mandatory
₹11,000
Executive Engineer RNb Dalgate DIvision Sgr
₹40.0 L
Chief Engineer PWD RNB Central Kashmir
29 Oct 2025
4 Oct 2025
16 Oct 2025
5 Oct 2025
15 Oct 2025
5 Oct 2025
7 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. | 11,836.86 | Kg | 4.3 | ₹50,898.5 |
| 2 | Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in : Channels, angles, tees and flats. | 15,796.4 | Kg | 1.75 | ₹27,643.7 |
| 3 | Dismantling and stacking within 50 meters lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of T or L iron or pipe. | 1,056 | No | 179.2 | ₹1,89,235.2 |
| 4 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar. | 98.45 | Cum | 2,036.4 | ₹2,00,483.58 |
| 5 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge. | 90 | Mtr | 27.8 | ₹2,502 |
| 6 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 308.15 | Cum | 1,725.2 | ₹5,31,620.38 |
| 7 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometer, as per direction of Engineer-in-charge. | 90.45 | Cum | 336.3 | ₹30,418.34 |
| 8 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm. | 1,087.5 | Sqm | 89.95 | ₹97,820.63 |
| 9 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge n cement mortar. | 89.5 | Cum | 1,458.45 | ₹1,30,531.28 |
| 10 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar. | 1.35 | Cum | 1,740.45 | ₹2,349.61 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_933159.xls
BOQ • 0.42 MB
183010011.html
Tender Documents • 0.06 MB
183068269.pdf
Tender Documents • 1.65 MB
183068270.pdf
Tender Documents • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .