| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59.2 LAdmitted-Finance | -31.01% | ₹59.2 L | L1 | Admitted-Finance |
| 2 | L2₹60.8 L+₹1.6 L (2.67%)Admitted-Finance | -29.17% | ₹60.8 L+₹1.6 L (2.67%) | L2 | Admitted-Finance |
| 3 | L3₹64.1 L+₹4.9 L (8.33%)Admitted-Finance | -25.26% | ₹64.1 L+₹4.9 L (8.33%) | L3 | Admitted-Finance |
| 4 | L4₹65.6 L+₹6.4 L (10.9%)Admitted-Finance | -23.51% | ₹65.6 L+₹6.4 L (10.9%) | L4 | Admitted-Finance |
| 5 | L5₹66.0 L+₹6.9 L (11.6%)Admitted-Finance | -23.00% | ₹66.0 L+₹6.9 L (11.6%) | L5 | Admitted-Finance |
Tender Value
₹85.8 L
EMD Value
₹1.7 L
Closing Date
28 Apr 2026, 3:00 pmClosed
Executive Engineer
O/o EE(C), CHMD (East), PWD, GTB Hospital Campus,
Replacement of damaged PVC Water Storage Tank by SMC panel tank on the roof of MCH FNCON and DEM Building in GTB Hospital Shahdara Delhi
2026_PWD_290104_1
05/EE/BPD B-221(N)/CHMD(East)/2026-27
Open Tender
Civil Works
Works
90 days
GTB Hospital Shahdara Delhi
Please refer tender documents
10 documents required · 10 mandatory
₹0
₹1.7 L
Yes
30 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: | |||||
| 1.1 | 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 2Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 2.1 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 3Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | |||||
| 4Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 4.1 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 5Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | |||||
| 6Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | |||||
| 76 mm cement plaster of mix : | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.04 MB
BOQ_385132.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .