Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹518.3 CrAccepted-Finance | ₹518.3 Cr | L1 | Accepted-Finance Responsive |
| 2 | L2₹582.5 CrAccepted-Finance 626 6TH FLOOR DLF TOWER A DLF TOWER 626 6TH FLOOR DLF TOWER A JASOLA JASOLA SOUTH DELHI DELHI 110076 | SOUTH DELHI | DELHI | 110076 | ₹582.5 Cr | L2 | Accepted-Finance Responsive |
| 3 | L3₹604.9 CrRejected-Finance | ₹604.9 Cr | L3 | Rejected-Finance Bid validity not extended by the bidder. |
Tender Value
₹307.8 Cr
EMD Value
₹6.2 Cr
Closing Date
7 Mar 2024, 1:00 pmClosed
Chief Engineer (Projects)
MeECL, Lumjingshai, Shillong
Appointment of Advanced Metering Infrastructure (AMI) Service Provider for Smart Prepaid Metering In Meghalaya on DBFOOT(Design,Build,Finance,Own,Operate, and Transfer) Basis.
2024_MeECL_1500_1
CE(P)/(RDSS-SM-AMISP)/23-24/05
Open Tender
Electrical Works
120 days
Meghalaya
Please refer Tender documents.
4 documents required · 4 mandatory
₹50,000
MeECL Principal Account
₹6.2 Cr
MeECL Conference Room
3 Sept 2024
17 Jan 2024
7 Mar 2024
17 Jan 2024
7 Mar 2024
2 Feb 2024
29 Jan 2024
Meters(eachwithrelatedmeterbox,hardware,softwareandequipment)
Single phase whole current SmartMeter(without Net-Metering) – Consumer Meter with Meter Box,Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Single phase whole current Smart Meter (with Net-Metering) – Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Three Phase whole current Smart Meter(without Net-Metering) –Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Three Phase whole current Smart Meter(with Net-Metering) – Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate Seal
Three phase LT-CT operated Smart Meter (without Net-Metering) –Consumer Meter with CTs, control cables, without DI provisions Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Three phase LT-CT operated Smart Meter (with Net-Metering) –Consumer meter with CTs, control cables, without DI provisions Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Three phase LT-CT operated SmartMeter (with Net-Metering) – DT Meter with CTs,control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Three phase LT-CT operated Smart Meter – Boundary Meter with CTs,control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no.of polycarbonate seal
Three phase CT/PT operated Smart Meter – Feeder Meter with CTs,control cables, with DI provisions Meter Boxand Back-end IT Infra with associated works and requisite no.of polycarbonate seal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid