Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94,043.29Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹94,043.29 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹94,043.29Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹94,043.29 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹1.1 L+₹11,767.17 (12.5%)Admitted-Fee/PreQual/Technical/Finance | -9.99% | ₹1.1 L+₹11,767.17 (12.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹1.1 L+₹15,282.04 (16.3%)Admitted-Fee/PreQual/Technical/Finance | -7.00% | ₹1.1 L+₹15,282.04 (16.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.2 L
EMD Value
₹3,540
Closing Date
4 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF R/WALL INSIDE LAND FROM HO GULZAR AHMAD KHAN AND OTHERS AT CHECK DADOO
2026_RDPR_318630_3
E-NIT 82 of 2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,540
7 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Engagement of manual labour for Clearence of site including disposal of same, all complete job | - | lab | - | - |
| 0.0 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 1 | cum | - | - |
| 0.0 | Supplying and laying of stone soling hand packed tightly including ramming, watering. Incld carriges | 1 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 20mm nominal Size) | - | cum | - | - |
| 0.0 | cenetering and shuttering inc. propping etc and removal of same inc. all carriages. | 1 | sqm | - | - |
| 0.0 | 12 mm thick plaster in Cement Mortar 1:4 mix. | 1 | sqm | - | - |
| 0.0 | excavating supplying stacking of good earth (inc royalty) by mt of 5km inc ramming and watering of earth in layers not exceeding 20cm cj | - | Cum | - | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.0 | carraiage of good earth upto 5km inc loading unloading and stacking by mt upto 5km | - | cum | - | - |
| 0.0 | aggregates 15km | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1051192.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .