| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC SURYA FACTORY SORAN ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹4.3 Cr | L1 | Accepted-AOC Financial bid is Accepted at the rate of Rs 42511813.50 |
| 2 | L2₹4.3 Cr+₹8.9 L (2.10%)Rejected-Finance 2009 SECTOR 16 A VASUNDHARA GHAZIABAD | ₹4.3 Cr+₹8.9 L (2.10%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.4 Cr+₹13.3 L (3.13%)Rejected-Finance | ₹4.4 Cr+₹13.3 L (3.13%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.5 Cr+₹28.0 L (6.59%)Rejected-Finance | ₹4.5 Cr+₹28.0 L (6.59%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹5.4 Cr+₹1.1 Cr (26.2%)Rejected-Finance 22 AAKASH PURAM VISTAR PILIPHIT BYPASS BAREILLY | ₹5.4 Cr+₹1.1 Cr (26.2%) | L5 | Rejected-Finance Rejected |
Tender Value
₹5.9 Cr
EMD Value
₹11.7 L
Closing Date
10 Nov 2023, 12:00 pmClosed
SE BLY CIRCLE PWD BLY
SE BLY CIRCLE PWD BLY
Widening and Strengthening of PSHL Road to Rosarkothi Sugar Mil Road in Distt Shahjahanpur. (Fin-Year 2023-24)
2023_CEBLY_850111_1
8888/141C(E-Tender)-3/23-24 Date 05/10/2023
Open Tender
Civil Works - Roads
Item Wise
180 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,725
₹11.7 L
Yes
SE BLY CIRCLE PWD BLY
4 Jan 2024
13 Oct 2023
10 Nov 2023
13 Oct 2023
10 Nov 2023
13 Oct 2023
13 Oct 2023
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of Embankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compacted to meet requirement of table 300-2, MORT&H Specification-305 (carted earth 2.00Km.)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as MoRTH specification clause 406. (Wet Mix Macadam 3.50% emulsion+1% cement) Stabilized WMM
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.25 kg per sqm on the prepared surface cleaned with hydraulic broom For Granular Surface.
Providing and laying of dense graded bituminous macadam with HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 grade @ 4.50% as per job mix , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects. ( Grade -II )
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom .For BC
Providing and laying bituminious concrete with HMP 60-90 TPH producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% as per job mix, and filler, transporting the hot mix to work site,laying with a Machnical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.
Providing and laying of factory made 80 mm thick Interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of Interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc.required for proper completion of work as directed by Engineer-in-Charge. As Per SOR No. 786
Providing/Laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry, but 350 mm dia
Providing/Laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry, but 600 mm dia
Providing/Laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry, but 1000 mm dia
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per Ref to MoRTH specifications 304 Sr.No 12.1
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in 1:3 cement mortar in Sub Structure ie HP/RCC culvert, Retaining wall etc complete excluding pointing and plastering as per drawing and technical specification.
Pointing with cement mortar (1:3) on brick work in sub structure ie HP/RCC culvert, Retaining wall etc as per drawing and technical specification Clauses 613.3 & 1204.
Providing and laying Bricks Ballast 40 mm gauge Filter Material underneath Pithing in Slope, behind abutment, wing wall & return wall and HP Culverts complete as per drawing & technical specification.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M-20 As per Ref to MoRTH specifications 1500, 1700 & 2100 Sr.No 12.8 RCC Grade M-20
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M-20 As per Ref to MoRTH specifications 1500, 1700 & 2100 Sr.No 12.8 RCC Grade M-15
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
RADHEY SHYAM SINGH
ROHITCONSTRUCTION COMPANY
SHAKUNTALA SINGH
M/S STONE HEIGHTS INFRA
SHARMA CONSTRUCTION PROJECT PVT LTD
NP BUILDWELL PRIVATE LIMITED
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .