| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr | L1 | Accepted-AOC L1 contractor |
| 2 | L2₹5.4 Cr+₹7.6 L (1.42%)Rejected-Finance | ₹5.4 Cr+₹7.6 L (1.42%) | L2 | Rejected-Finance L2 CONTRACTOR |
| Sl No | Description | Qty | Unit | T PAULKANNU & CO L2 | K.GUBENDRAANS AND CO L1 |
|---|---|---|---|---|---|
| 1.00PROJECT : Construction of Panchayat Union office Building at Kottampatti Union Madurai District | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 907.15 | m3 | 246 ₹2,23,158.9 Lowest | 246 ₹2,23,158.9 Lowest |
| 3.00 | Refilling the foundation with Excaveted Earth in layers of not more than 15cm thick well rammed, watered and consolidated as directed by the deptl. officers. Complete complying with standard specifications. | 601.69 | m3 | 50 ₹30,084.5 | 42.5 ₹25,571.83 Lowest |
| 4.00 | Refilling the foundation with Excaveted Earth in layers of not more than 15cm thick well rammed, watered and consolidated as directed by the deptl. officers. Complete complying with standard specifications. | 302.25 | m3 | 50 ₹15,112.5 | 42.9 ₹12,966.53 Lowest |
| 5.00 | Providing Pre-constructional anti- termite treatment and creating a chemical barrier to the building by injecting chemical emulsion of required concentrations raft slab and beam, under Cellular raft slab, around the footings, column pits, trenches, pits, wall trenches, back fill, plinth filling, junction of wall and floor, side walls of foundation, external perimeter of building, surrounding of pipes expansion joints, etc. as per IS specification and as per the instructions of chemical manufacturer and all as directed. The treatment shall be carried out strictly in accordance with the technical specification and conforming to IS 6313 (PART-2) or equivalent BS specification.
1. The chemical to be used as insecticides for the treatment shall be Termitee oil 20% (or) 50% EC and the application shall be dilute one part of chemical 20% or 50% EC with 19 or 49 parts of water to get 1% emulsion and strictly in accordance with the manufacturer's specification.( or)2.The chemical to be used as insecticides for the treatment shall be IMIDACLOPRID 30.5% S C and the application shall be applied at 0.075% active ingredients concentration i.e. 2.1ml formulated product diluted 1 lit of water and strictly in accordance with the manufacturer's specification. | 986.4 | m2 | 120 ₹1,18,368 Lowest | 120 ₹1,18,368 Lowest |
| 6.00 | Supplying and Filling Gravel : Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm thick well rammed, watered and compacted -1m3 etc. complete complying with standard specifications.. | 380.99 | m3 | 606 ₹2,30,879.94 Lowest | 606 ₹2,30,879.94 Lowest |
| 7.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 152.65 | m3 | 2,020 ₹3,08,353 Lowest | 2,020 ₹3,08,353 Lowest |
| 8.00 | Cement Concrete 1:4:8using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification . | 153.32 | m3 | 5,373 ₹8,23,788.36 Lowest | 5,373 ₹8,23,788.36 Lowest |
| 9.00 | Supplying and erecting water tight steel shuttering to centering including necessary supports for plane surface in Foundation and Basement for RCC Columns, Footings, Plinth beams, bed blocks, staircase steps etc., using suitable mild steel sheets etc., complete.
Footing ,Plinth beam ,Column upto Basement | 1,027.35 | m2 | 516.75 ₹5,30,883.11 Lowest | 516.75 ₹5,30,883.11 Lowest |
| 10.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. | |||||
Tender Value
Refer Docs
EMD Value
₹5.5 L
Closing Date
16 Dec 2024, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Retender for Construction of Panchayat union office building at Kottampatti Block under SCPAR (2024-25)
2024_RDTN_508634_1
DIPR/5348/TENDER/2024
Open Tender
Civil Works
Item Rate
540 days
Kottampatti
Refer Tender document
4 documents required · 4 mandatory
₹0
₹5.5 L
29 Oct 2025
7 Dec 2024
16 Dec 2024
9 Dec 2024
16 Dec 2024
10 Dec 2024
9 Dec 2024 - 14 Dec 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .