Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹5.0 LAccepted-AOC 04 SUDARSHNA COOLING CENTRE ADP ROAD CHRISTIANPATTY NAGAON ASSAM 782001 UDYAM AS 22 0000781 | NAGAON | ASSAM | 782001 | ₹5.0 L Quoted ₹5.1 L | L2 | Accepted-AOC Being a MSME registered company and the quote rate is within the range of L1 plus 15 percent and also willing to work at L1 rate and as per NIT the work is non splitable. |
| 2 | L1₹5.0 LRejected-Finance | ₹5.0 L | L1 | Rejected-Finance Not a MSME Registered company and quoted rate of L2 agency (MSME) is within the range of L1 plus 15 percent and as per NIT the work is non splitable |
| 3 | Rejected-Technical | - | - | Rejected-Technical Agency failed to submit work experience as per e-NIT |
Tender Value
₹5.3 L
EMD Value
₹10,676
Closing Date
14 Mar 2022, 11:00 amClosed
AGM(E-E),Tezu Airport
AGM(E-E),Tezu Airport,792001
Annual Comprehensive Maintenance Contract and Operation of Split/Window type Air-conditioners and Water Coolers/Purifiers at Tezu Airport (2022-23)
2022_AAI_106112_1
AAI/TEZU/AGM(E-E)/eNIT1/21-22
Open Tender
Electrical Works
365 days
AGM(E-E), Tezu Airport
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,180
Yes
₹10,676
Yes
25 Apr 2022
16 Feb 2022
15 Mar 2022
17 Feb 2022
14 Mar 2022
17 Feb 2022
17 Feb 2022 - 22 Feb 2022
Amount
SUB HEAD-A: Comprehensive Maintenance of split type Air- conditioners , Window AC and water coolers Annual comprehensive maintenance of follwing single phase air-conditioners of different makes at different locations including repair/replacement of all parts motors /PCB/ spare /all necessary consumables and refrigerent, gas charging etc except compressor complete as required as per special condition including CMC of voltage stablizers, whereever connected etc as required. (1.5 TR Inverter type split AC)
Annual comprehensive maintenance of follwing single phase air-conditioners of different makes at different locations repair/replacement of all parts motors /PCB/ spare /all necessary consumables and refrigerent, gas charging etc including replacement of faulty compressor complete as required as per special condition including CMC of voltage stablizers, whereever connected etc as required. (1.5T/2.0 TR split AC)
Annual comprehensive maintenance of follwing single phase air-conditioners of different makes at different locations repair/replacement of all parts motors /PCB/ spare /all necessary consumables and refrigerent, gas charging etc including replacement of faulty compressor complete as required as per special condition including CMC of voltage stablizers, whereever connected etc as required. (1.5/2.0 TR Window AC)
Annual Comprehensive Maintenance of BLUE STAR Model No. SDLX8120 water coolers of all type & makes and upto 120/80Lts cooling/storing capacities at different location with providing necessary consumables, spares, refrigerent etc including replacement of faulty compressor complete as required as per special condition including CMC of voltage stablizers whereever connected etc complete as required.
Annual Comprehensive Maintenance of water purifiers of Make- Eureka Forbes, Model: AQUA GAURD-200 installed at different location including replacement of all defective components etc and consumables and carrying out bimonthly servicing at installed position etc complete as required.
Annual Comprehensive Maintenance of RO+UV filter cum purifier (Make- Aquainis Tecchnology Pvt. Ltd) installed at different location including replacement of all defective components like UV lamps, membranes etc and carrying out bimonthly servicing at installed position etc complete as required.
Sub Head B: Operation & Maintainence Operation of various type ACs, Water cooler, Water purifiers installations at Tezu Airport involving operation, attending to complaints/faults/ breakdowns, taking rectification action ,maintenance of records/ documents etc as per the detailed specifications, terms and conditions covered under this contract on all days excluding one weekly off (Skilled AC & RO Mechanic Cum Technician - 1 No.)
Sub Head C :Supply of Spares & other works not included in CMC Supply and installation of Copper refrigerant piping suitable size up to 2TR split air conditioning of all type for inlet and out let of refrigerant gas complete with electrical cabling and insulation etc. complete as required.
Supply and installation of 20 mm dia PVC rigid drain pipe i/c all accessories like bends, couplers, tees etc. complete as required.
Supply and fixing of insulation of nitrile rubber in existing Copper tubing for both inlet and outlet of existing installed air conditioner etc complete as required as per direction of EIC.
Dismantling of high wall split type Air Conditioning unit of different make and shifting to other location within Airport premises in good condition including re-installation, testing and commissioning of capacity upto 2.0 TR air-conditioner unit fixing of existing refrigerant pipe , insulation & existing fiexible copper conductor cable between evaporator and condensor units, topping up refrigerant gas etc complete as required as per direction of EIC.
sudarshnacoolingcentre andelectricals
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid