Directorate of Municipal Administration
CONSTRUCTION OF PIPE CULVER AT WARD NO 18 AND PROVOIDING CULVERT SLAB AT WARD NO 16 OF KAKKERA TOWN
DMA/2025-26/BR/WORK_INDENT40668
DMA/2025-26/BR/WORK_INDENT40668
Open
Bridges/Culverts
Electronic Documents, First(One Cover)
DMA Town Municipal Council Kakkera
₹500
₹10,464
29 May 2025
29 May 2025
4 Jun 2025
CONSTRUCTION OF PIPE CULVER AT WARD NO 18 AND PROVOIDING CULVERT SLAB AT WARD NO 16 OF KAKKERA TOWN
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Percentage Additionalities for Formwork, Centering & Scaffolding Cement Concrete Drain Walls : 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, Laping/welding joints, tyin...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .