| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.9 CrAccepted-AOC 0 | ₹18.9 Cr Quoted ₹30.7 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹33.9 CrRejected-Finance | ₹33.9 Cr | 2 | Rejected-Finance 2 |
| 3 | 3₹34.3 CrRejected-Finance GORAKHPUR | UTTAR PRADESH | 273001 | ₹34.3 Cr | 3 | Rejected-Finance 3 |
| 4 | 4₹38.0 CrRejected-Finance | ₹38.0 Cr | 4 | Rejected-Finance 4 |
Tender Value
₹45 Cr
EMD Value
₹50 L
Closing Date
4 Mar 2025, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Widening and Strengthening with 02 Lane Paved Sholder Bhiti Bansgoan Gola Road (SH-146) Ch. 25.200 to 41.330 in Distt Gorakhpur (Including 05 Year Maintenance) (LOT NO-1/1)
2024_CEGKP_988139_1
8202(i)/135C-Gkp Circle/2024 Dated 07-12-2024
Open Tender
Civil Works
450 days
Gorakhpur
c
3 documents required · 3 mandatory
₹2,714
₹50 L
4 Jun 2025
3 Jan 2025
4 Mar 2025
3 Jan 2025
4 Mar 2025
3 Jan 2025
Amount
Road Work
Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . (Including Labour Cess & GST will paid extra as applicable)
Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer, for girth size above 300mm(Including Labour Cess & GST will paid extra as applicable)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Labour Cess & GST will paid extra as applicable)
Removal of unserviceable soil including excavation, loading and disposal upto 10 km lead but excluding replacement by suitable soil which shall be paid seperatelyas per clause 305 (Including Labour Cess & GST will paid extra as applicable)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.( Lead 8 km) (Including Labour Cess & GST will paid extra as applicable)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including Labour Cess & GST will paid extra as applicable)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 8 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORTH specification no. 305 (Including Labour Cess & GST will paid extra as applicable)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including Labour Cess & GST will paid extra as applicable)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including Labour Cess & GST will paid extra as applicable)
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including Labour Cess & GST will paid extra as applicable)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(Including Labour Cess & GST will paid extra as applicable)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including Labour Cess & GST will paid extra as applicable)
Construction of U-type Drain (450x600m) along the road side as per analysis attached (Including Labour Cess & GST will paid extra as applicable)
Construction of 1x2 M Span RCC Box Culvert
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(lead 1km) (Including Labour Cess & GST will paid extra as applicable)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Including Labour Cess & GST will paid extra as applicable)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.(Including Labour Cess & GST will paid extra as applicable)
Brick Masonry Work in Cement Mortar 1:3 in Sub-structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including Labour Cess & GST will paid extra as applicable)
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification (Including Labour Cess & GST will paid extra as applicable)
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (Including Labour Cess & GST will paid extra as applicable)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications (Including Labour Cess & GST will paid extra as applicable)
O.B.B Filter Material behind abutment & wing wall (Including Labour Cess & GST will paid extra as applicable)
Construction of 1x6 M Span RCC Box Culvert
Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. (Including Labour Cess & GST will paid extra as applicable)
Plain cement concrete M-15 in culvert complete as per Drawing and Technical Specification (Including Labour Cess & GST will paid extra as applicable)
M-30 Reinforced Cement Concrete in box culvert complete as per Drawing and Technical Specification (Including Labour Cess & GST will paid extra as applicable)
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (Including Labour Cess & GST will paid extra as applicable)
Plain cement concrete M-20 in culvert complete as per Drawing and Technical Specification (Including Labour Cess & GST will paid extra as applicable)
M.S or iorn work in angle iorn for joint including Supply of matrial labour T&P etc Required for proper compltion of work size 100x100x8 mm si no 503 (a) (Including Labour Cess & GST will paid extra as applicable)
05 Year Maintenance work
Maintenance Cost of 1st Year …………. 0% (as per G.O. No/ 17/2024/SA0-113/23-1-2024-23-1099/113/2023 dated 16-01-2024)
Maintenance Cost of 1st Year …………. 0.25% (as per G.O. No/ 17/2024/SA0-113/23-1-2024-23-1099/113/2023 dated 16-01-2024)
Maintenance Cost of 1st Year …………. 0.50% (as per G.O. No/ 17/2024/SA0-113/23-1-2024-23-1099/113/2023 dated 16-01-2024)
Maintenance Cost of 1st Year …………. 0.75% (as per G.O. No/ 17/2024/SA0-113/23-1-2024-23-1099/113/2023 dated 16-01-2024)
Maintenance Cost of 1st Year …………. 1.00% (as per G.O. No/ 17/2024/SA0-113/23-1-2024-23-1099/113/2023 dated 16-01-2024)
M/S GOVIND MADHAV (BID ID -5015247)
M/s VIJENDRA PRATAP SINGH (BID ID -4889142)
M/S R.K.TRADERS (BID ID -4865540)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid