| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 LAdmitted-Finance 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹3.7 L | L2 | Admitted-Finance |
| 3 | L3₹3.8 LAdmitted-Finance KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | ₹3.8 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ROY ENTERPRISE L2 | NEW ELECTRICAL CONCERN L1 | KEKA ARMATURE REPAIRING SHOP L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Dismantling of core & winding from the tank and cleaning of all parts properly | 1 | LS | 5,700 ₹5,700 | 5,500 ₹5,500 | 6,250 ₹6,250 |
| 3.00 | Materials cost Bars copper conductor for Primary Coils | 227 | Kg | 985 ₹2.2 L | 975 ₹2.2 L | 995 ₹2.3 L |
| 4.00 | Materials cost Bars copper conductor for secondary Coils | 212 | Kg | 985 ₹2.1 L | 975 ₹2.1 L | 995 ₹2.1 L |
| 5.00 | Materials cost TPC for bar copper conductor for primary & secondary coils | 439 | Kg | 175 ₹76,825 | 150 ₹65,850 | 178.51 ₹78,365.89 |
| 6.00 | Materials cost Brazing rupaton rod, oxygen, DA for brazing of all primary & Secondary interconnections | 1 | LS | 2,550 ₹2,550 | 2,500 ₹2,500 | 2,550 ₹2,550 |
| 7.00 | Supply & fitting of Neoprene synthetic gasket at top cover and inspection cover | 1 | LS | 5,250 ₹5,250 | 5,000 ₹5,000 | 5,250 ₹5,250 |
| 8.00 | Supply & fitting of new tap changer mechanism complete | 1 | LS | 9,200 ₹9,200 | 8,500 ₹8,500 | 9,200 ₹9,200 |
| 9.00 | Insulating materials, varnish presspond paper, oil duct, cotton tape, webbing tape etc. | 1 | LS | 12,500 ₹12,500 | 12,700 ₹12,700 | 12,500 ₹12,500 |
| 10.00 | Dehydration and Filtration of transformer oil up to increase di-electric strength up to required value | 750 | Ltrs | 18.75 ₹14,062.50 | 18 ₹13,500 | 19.25 ₹14,437.50 |
Tender Value
₹3.7 L
EMD Value
₹4,700
Closing Date
26 Feb 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Complete repairing and rewinding of 500 KVA, 3.3KV-440 V Marson Make Lighting transformer at OCP substation of CL Jambad OCP under Kenda Area
2026_ECL_353302_1
GM/KND/AE(ENM)/55(TN)/25-26/62
Open Tender
Miscellaneous Works
10 days
CL Jambad Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,700
18 Mar 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
16 Feb 2026 - 21 Feb 2026
Item Description/ Heading
Dismantling of core & winding from the tank and cleaning of all parts properly
Materials cost Bars copper conductor for Primary Coils
Materials cost Bars copper conductor for secondary Coils
Materials cost TPC for bar copper conductor for primary & secondary coils
Materials cost Brazing rupaton rod, oxygen, DA for brazing of all primary & Secondary interconnections
Supply & fitting of Neoprene synthetic gasket at top cover and inspection cover
Supply & fitting of new tap changer mechanism complete
Insulating materials, varnish presspond paper, oil duct, cotton tape, webbing tape etc.
Dehydration and Filtration of transformer oil up to increase di-electric strength up to required value
Fittings of core channel G formation for primary & secondary coils
Painting of above transformer by one coat of primar paint & two coats of metallic paint
Labour charges for reformation of coil assembly inter-connection, cleaning of core etc.
Less: Old copper scrap value (-)
Both side Transportation with Handling charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_366084.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid