Tender Value
₹7.9 L
EMD Value
₹16,000
Closing Date
11 Oct 2026, 6:00 pm4d left
EE Arki
ARKI DIVISION HPPWD ARKI
Construction of civil works in Ground floor upto columns) under DMFT Deposit.
2026_PWD_144964_1
NIT NO. 8124-29 DT. 25.09.2026
Open Tender
Civil Works
Percentage
60 days
Arki
AS PER SBD
11 documents required · 11 mandatory
₹350
₹16,000
4 Oct 2026
4 Oct 2026
12 Oct 2026
4 Oct 2026
11 Oct 2026
4 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of surplus excavated earth upto all leads and lifts dressing of sides and bottom and backfilling in trenches with excaveted suitable materials and disposing of unserviceable material, disposed earth to be levelled and neatly dressed as per MORD Specification and as per the direction of Engineer-In-Charge | 86.59 | Cum | 171.4 | ₹14,841.53 |
| 2 | Providing and laying cement concrete 1:4:8 (one cement four sand eight graded stone aggregate forty milimetre nominal size) and curing complete excluding cost of form work in foundation and plinth with pidilite or Dr fixit water proofing treatment as per the direction of the Engineer-in-Charge but including carriage of materials up to all leads and lifts | 27.2 | Cum | 5,281.2 | ₹1,43,648.64 |
| 3Centering and shuttering including strutting, proping etc. and removal for the same concrete work including carriage of materials upto all leads and lifts as per the direction of the Engineer-in-Charge | |||||
| 3.1 | Foundation, footings basis of columns etc. and mass concrete. | 41.28 | Sqm | 216.45 | ₹8,935.06 |
| 3.2 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like. | 25.92 | Sqm | 468.3 | ₹12,138.34 |
| 3.3 | Columns, pillars, posts and struts | 28.8 | Sqm | 514.75 | ₹14,824.8 |
| 3.4 | Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels not exceeding 1 metre in depth in all heights from floor. | 28.53 | Sqm | 387.15 | ₹11,045.39 |
| 4 | Filling in plinth with sand under floors including watering ramming, consolidating and dressing complete including carriage of materials upto all leads and lifts as per the direction of the Engineer in-Charge | 3.96 | Cum | 1,880.15 | ₹7,445.39 |
| 5 | Providing and laying cement concrete 1:1.50:3 (one cement isto one point five zero sand isto three graded stone aggregate 20mm twenty milimetre nominal size) and curing complete including the cost of form work with steel plates and fixed by bitumen drams in dressiest as per drawing and HP.PWD specifications as per the direction of the Engineer-in-Charge but including carriage of materials up to all leads and lifts | 18.95 | Cum | 6,656.05 | ₹1,26,132.15 |
| 6 | Providing and laying in position machine batched and machine mixed design mixed M-25 grade cement concrete for Reinforced using cement concrete work in walls (any thickness) including attaching pillasters, buttresses plinth and string courses colomas, pillars etc. as per design mix, icluding pumpling of concrete to site of laying, but excluding cost of centering, shuttering finishing and reinforcement: complete including admixtures in reccommended ptopportions as per 15 :9103 to accelerate retard setting of concrete, improve workability with out impairing strength and durability including carriage of materials, labour, tool and plant through all modes of transportion within all leads and lifts and as per direction of Engineer-in-Charge all work above plinth level upte floor five level. | 6.1 | Cum | 7,633.2 | ₹46,562.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
2GraminHattNearNewBusStandKunihar.pdf
Tender Documents • 4.63 MB
BOQ_215742.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .