| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.3 CrAccepted-Finance 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹4.5 Cr+₹24.0 L (5.64%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RUCHI CONSTRUCTION CO L2 | AKANKSHA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION WING WELL | |||||
| 1.01 | E/W in excavation of foundation in all types of soil including all leads, lifts and proper disposal as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 41,796.59 | M3 | 117.39 ₹49,06,501.7 | 110 ₹45,97,624.9 Lowest |
| 1.02 | Centering & shuttering of C.C & RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 5,790.7 | M2 | 487.5 ₹28,22,966.25 | 462.5 ₹26,78,198.75 Lowest |
| 1.03 | Laying C.C- A 40 M10 in foundation of all structures with Cement (O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 442.44 | M3 | 11,727.66 ₹51,88,785.89 | 11,126.24 ₹49,22,693.63 Lowest |
| 1.04 | Laying C.C.A20 - M-25 with cement (OPC 43 grade), coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc. | 1,159.48 | M3 | 12,275.09 ₹1,42,32,721.35 | 11,645.6 ₹1,35,02,840.29 Lowest |
| 1.05 | Cutting, bending , placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc. | 91.07 | MT | 70,599.75 ₹64,29,519.23 | 66,979.25 ₹60,99,800.3 Lowest |
| 1.06 | E/W in dry earth filling including all leads, lifts and dressing to profile as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 3,729.69 | M3 | 99.45 ₹3,70,917.67 | 94.35 ₹3,51,896.25 Lowest |
| 1.07 | Supplying and fixing 100 mm dia CPVC pipe for weep holes including cost of all material, labour, and T&P etc. | 528 | RM | 1,713.85 ₹9,04,912.8 | 1,625.97 ₹8,58,512.16 Lowest |
| 1.08 | Dewatering with all cost of power/POL machine, pump, well point system & operator etc with assembling & dismantling of equipments etc required for proper completion of work. | 91,086.6 | KWH | 44.69 ₹40,70,660.15 | 42 ₹38,25,637.2 Lowest |
| 1.09 | S/L local sand under boulder pitching required for proper completion of work including cost of all material, T&P & labour etc. | 190.42 | M3 | 1,169.01 ₹2,22,602.88 | 1,109.07 ₹2,11,189.11 Lowest |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
21 Sept 2026, 10:00 amClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
As per Tender Notic
2026_UPIDC_1178466_3
02/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Siddharthnagar
s per Tender Notic
2 documents required · 2 mandatory
₹2,354
₹9.2 L
Yes
29 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION WING WELL | |||||
| 1.01 | E/W in excavation of foundation in all types of soil including all leads, lifts and proper disposal as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 41,796.59 | M3 | - | - |
| 1.02 | Centering & shuttering of C.C & RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 5,790.7 | M2 | - | - |
| 1.03 | Laying C.C- A 40 M10 in foundation of all structures with Cement (O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 442.44 | M3 | - | - |
| 1.04 | Laying C.C.A20 - M-25 with cement (OPC 43 grade), coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc. | 1,159.48 | M3 | - | - |
| 1.05 | Cutting, bending , placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc. | 91.07 | MT | - | - |
| 1.06 | E/W in dry earth filling including all leads, lifts and dressing to profile as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 3,729.69 | M3 | - | - |
| 1.07 | Supplying and fixing 100 mm dia CPVC pipe for weep holes including cost of all material, labour, and T&P etc. | 528 | RM | - | - |
| 1.08 | Dewatering with all cost of power/POL machine, pump, well point system & operator etc with assembling & dismantling of equipments etc required for proper completion of work. | 91,086.6 | KWH | - | - |
| 1.09 | S/L local sand under boulder pitching required for proper completion of work including cost of all material, T&P & labour etc. | 190.42 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_2231279.xls
BOQ • 0.24 MB
1492026.pdf
Tender Documents • 3.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .