| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.1 L+₹583.71 (0.14%)Rejected-AOC | ₹4.1 L+₹583.71 (0.14%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | siva kumar L1 | B SHANAVAS L2 |
|---|---|---|---|---|---|
| 1.00 | Removal and Relaying of RCC Cover Slabs the existing drain including all labours etc., complete | 4.5 | m2 | 603 ₹2,715.43 Lowest | 605 ₹2,724.44 |
| 2.00 | Desilting the existing drain including all labours etc., complete | 11 | m3 | 128 ₹1,408 Lowest | 130 ₹1,430 |
| 3.00 | Dismantling the existing damaged PCC drain wall including all labours etc., complete | 12 | m3 | 572 ₹6,866.4 Lowest | 574 ₹6,890.41 |
| 4.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton,hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 60 | m3 | 220 ₹13,199.08 Lowest | 222 ₹13,319.07 |
| 5.00 | Plain Cement concrete 1:4:8 mix (one cement, four sand, eight metal) using 40mm size Hard Broken stone etc complete | 9 | m3 | 5,962 ₹53,628.19 Lowest | 5,964 ₹53,646.18 |
| 6.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29m high for plane surfaces for drain, culverts etc., using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.5cm spaced at about 90cm centre to centre and supported by Casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete as directed. | 176 | m2 | 534 ₹93,984 Lowest | 535 ₹94,160 |
| 7.00 | Plain concrete 1:3:6 (one cement, two sand and four aggregate) using 20mm ISS HBG metal including cost and conveyance of all material to work site and labor charges for mixing,laying,compacting and curing etc, complete as per ss | 32.35 | m3 | 6,721 ₹2,17,457.95 Lowest | 6,723 ₹2,17,522.66 |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 45 | m2 | 309 ₹13,905 Lowest | 311 ₹13,995 |
| 9.00 | Conveying the excavated earth, silt, brickwork, RR masonry etc from the site to 15km distance including loading and unloading etc complete | 60 | m3 | 104 ₹6,240 Lowest | 105 ₹6,300 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
3 Dec 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at Moovar Nagar West Side in Ward no 33 of West Zone
2025_MAWS_624559_4
E6/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
11 Apr 2026
20 Nov 2025
4 Dec 2025
21 Nov 2025
3 Dec 2025
21 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.32 MB
Additional Documents
Additional Documents • 0.26 MB
BOQ
BOQ • 0.26 MB
Tender Documents
Tender Documents • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .