Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81.0 LAccepted-AOC B 26 9 3RD FLOOR DELHI OKHLA VIHAR DELHI VILLAGE TOWN JAMIA NAGAR CITY DELHI SOUTH DELHI 110025 INDIA | SOUTH EAST DELHI | DELHI | 110025 | 1 | Accepted-AOC L-1 | |
| 2 | 2₹85.6 L+₹4.0 L (4.88%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹86.3 L+₹4.6 L (5.66%)Rejected-Finance SGTPS MPPGCL COLONY BIRSINGHPUR CAMP CHACHAI DISTT UMARIA MP | CHACHAI | UMARIA | MADHYA PRADESH | 484220 | 3 | Rejected-Finance L-3 |
Tender Value
₹75.7 L
EMD Value
₹1.5 L
Closing Date
29 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OMC I DTPS Kasimpur Aligarh
Office of the SE OMC I DTPS Kasimpur Aligarh
Round the Clock Operation Routine and Preventive mechanical maintenance and Breakdown mechanical maintenance of Ash Handling Plant of Unit No 08 and 09 DTPS HTPS Kasimpur for a period of one year
2020_RVUNL_484851_1
T-01/AHD/DTPS/HTPS/2020-21
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Ash Handling Plant DTPS
As per Tender Documents
4 documents required · 4 mandatory
₹1,180
SAO EPAD UPRVUNL Kasimpur
₹1.5 L
Ash Handling Plant DTPS
9 Sept 2020
20 Jun 2020
31 Aug 2020
20 Jun 2020
29 Aug 2020
20 Jun 2020
20 Jun 2020 - 29 Aug 2020
24 Aug 2020
120 days
Amount
Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.8 (250MW) or Unit No.9 (250MW).
Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.8 (250MW) & Unit No. 9 (250MW).
Break down maintenance of Ash Slurry Pumps, Ash Water pumps, Sealing Water Pumps, Drain Pumps etc as per details giving below:-
Dismantling & shifting of Ash Slurry Pump from its foundation at (-) 8.5 Mtr. to ground level (Zero meter).
Shifting of Overhauled/New Pump from ground Level to the foundation of Pump at (-) 8.5 Mtr.
Complete overhauling of ‘SAM’ make Ash Slurry Pumps
Dismantling &Shifting of BALP/FWP/FAHP/BAHP/ASP from its foundation to zero meter
Shifting of BALP/FWP/FAHP/BAHP/ASP from zero meter to the foundation of the pump.
Overhauling of Bottom Ash Low Pressure Pump (BALP)
Overhauling of Flushing Water Pump (FWP)
Overhauling of Bottom Ash High Pressure Pump (BAHP)
Overhauling of Fly Ash High Pressure Pump (FAHP)
Overhauling of Seal Water Pump
Overhauling of Drain Sump Pump
Overhauling of Bottom Ash Overflow Pump (BAOFP)
Alignment of Ash Slurry Pump
Alignment of Bottom Ash Overflow Pump
INDIA ENGINEERING WORKS
M/S K K POWER CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .