| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Finance | ₹16.3 L | L1 | Admitted-Finance |
| 2 | L2₹16.7 L+₹40,640 (2.50%)Admitted-Finance | ₹16.7 L+₹40,640 (2.50%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | LAKSHMI BHARATHI CONTRACTORS L2 | FINE TECH ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | In-active shop work: Handling, Acid cleaning of SS-304L pipes. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 136 | Inch Meter | 90 ₹12,240 Lowest | 95 ₹12,920 |
| 2.00 | In-active shop work: Bending of SS-304L pipes. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 32 | Inch Dia | 160 ₹5,120 Lowest | 160 ₹5,120 Lowest |
| 3.00 | In-active shop work: Butt/Nozzle welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in inactive areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 50 | Inch Dia | 1,100 ₹55,000 | 1,090 ₹54,500 Lowest |
| 4.00 | In-active shop work: Fillet welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in inactive areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 50 | Inch Dia | 700 ₹35,000 | 680 ₹34,000 Lowest |
| 5.00 | In-active Area Work: Installation of SS-304L pipes on supports, including site measurements and preparation of drawings, in inactive areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 140 | Inch Meter | 160 ₹22,400 | 155 ₹21,700 Lowest |
| 6.00 | Active Area Work: Installation of SS-304L pipes on supports, including site measurements and preparation of drawings, in active areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 26 | Inch Meter | 200 ₹5,200 | 180 ₹4,680 Lowest |
| 7.00 | Active Area Work: Butt/Nozzle welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in active areas having dose rate upto 50 mR/hr. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 10 | Inch Dia | 2,260 ₹22,600 Lowest | 2,350 ₹23,500 |
| 8.00 | Active Area Work: Fillet welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in active areas having dose rate upto 50 mR/hr. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 52 | Inch Dia | 1,225 ₹63,700 | 1,200 ₹62,400 Lowest |
| 9.00 | Active Area Work: Cutting of SS-304L Pipe lines. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 30 | Inch Dia | 65 ₹1,950 | 60 ₹1,800 Lowest |
| 10.00 | Highly Active Area Work: Installation of pipes (includes site measurements,preparation of drawings) on supports (Up to 25 NB will be considered as 1" dia) | 50 | Inch Meter | 1,250 ₹62,500 Lowest | 1,250 ₹62,500 Lowest |
Tender Value
₹15.8 L
EMD Value
₹31,531
Closing Date
6 Jul 2026, 3:00 pmClosed
GM, INRPK
GM, INRPK Kalpakkam
Piping, Equipment Erection and SS Lining works in Sodium Nitrate Storage Area and other Piping works in active areas of KARP and KARP-II
2026_BARC_912880_1
BARCF/IN-MA/KA/TR/299/2026
Open Tender
Miscellaneous Works
Item Rate
270 days
INRP, NRB, BARCF, Kalpakkam
Piping, Equipment Erection and SS Lining works in Sodium Nitrate Storage Area and other Piping works in active areas of KARP and KARP-II
7 documents required · 7 mandatory
₹0
₹31,531
29 Jul 2026
16 Jun 2026
9 Jul 2026
17 Jun 2026
6 Jul 2026
23 Jun 2026
17 Jun 2026 - 22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | In-active shop work: Handling, Acid cleaning of SS-304L pipes. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 136 | Inch Meter | - | - |
| 2 | In-active shop work: Bending of SS-304L pipes. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 32 | Inch Dia | - | - |
| 3 | In-active shop work: Butt/Nozzle welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in inactive areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 50 | Inch Dia | - | - |
| 4 | In-active shop work: Fillet welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in inactive areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 50 | Inch Dia | - | - |
| 5 | In-active Area Work: Installation of SS-304L pipes on supports, including site measurements and preparation of drawings, in inactive areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 140 | Inch Meter | - | - |
| 6 | Active Area Work: Installation of SS-304L pipes on supports, including site measurements and preparation of drawings, in active areas. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 26 | Inch Meter | - | - |
| 7 | Active Area Work: Butt/Nozzle welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in active areas having dose rate upto 50 mR/hr. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 10 | Inch Dia | - | - |
| 8 | Active Area Work: Fillet welding of SS-304L pipes, including edge preparation, fit-up, welding using GTAW process with Argon purging and shielding, dye penetrant testing of weld joint after root and final weld passes and weld passivation in active areas having dose rate upto 50 mR/hr. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 52 | Inch Dia | - | - |
| 9 | Active Area Work: Cutting of SS-304L Pipe lines. (Pipe sizes upto 25NB will be accounted as 1" Dia) | 30 | Inch Dia | - | - |
| 10 | Highly Active Area Work: Installation of pipes (includes site measurements,preparation of drawings) on supports (Up to 25 NB will be considered as 1" dia) | 50 | Inch Meter | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
GCC14.pdf
Additional Documents • 1.50 MB
BOQ_959367.xls
BOQ • 0.29 MB
TENDERDOCTR299.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .