RequiredExperience with Government
RequiredAnnual Turnover Modular Work Stations/Modular Staff Office Packages ( 34 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) SELLING UNIT Selling unit Order Quantity is number of Pieces Clusters of specified number of seats. (Price given is for full cluster module and not per seat) Order Quantity is number of Pieces Clusters of specified number of seats. (Price given is for full cluster module and not per seat) 1/5 GENERIC Type of system Tile based system (shape fit tiles) Tile based system (shape fit tiles) Type/Shape of cluster Single Seater Rectangular Cluster Single Seater L Shape Cluster
RequiredSingle Seater Rectangular Cluster
RequiredDouble Seater C shape Cluster with Curvilinear Top
RequiredDouble Seater T shape Cluster with Curvilinear Top
RequiredDouble Seater Rectangular shape Cluster with Side By Side sitting
RequiredDouble Seater Rectangular shape Cluster with Back to Back sitting
RequiredFour Seater H Shape Cluster with Curvilenear Top
RequiredFour Seater Plus Shape Cluster with Curvilenear Top
RequiredFour Seater Rectangular Cluster with Straight Line Side by Side Sitting
RequiredFour Seater Rectangular Cluster with 2 X 2 Opposite Sitting Wire Management for electric switch Skirting race-way * Foot edge of table top Flat with PVC lipping * Plain edge banded with 2mm PVC tape * Construction of drawer unit Wooden front with PVC lipping Wooden front with PVC lipping Construction of pedestal Free standing full height with castor Free standing full height with castor Type of pedestal Three drawer * Locking system of pedestal Center locking * Work top support Gable end made of prelaminated particle board Gable end made of prelaminated particle board Type of Drawer unit Moveable with castor whees * MATERIAL Frame material for work station Powder coated CRCA hollow system Powder coated CRCA hollow system Material of table top MDF board MDF board Material of tiles for top fabric tackable plus fabric magnetic plus fabric tackable plus fabric magnetic plus 2/5 white board white board Material of intermediate tiles white board made of decorative laminate with white glossy white board made of decorative laminate with white glossy Material of bottom tiles prelaminated particle board tile prelaminated particle board tile Overhead Storage Provided No Overhead Storage * DIMENSION Length of table top (main frame) ±10 mm(main frame) 1200 mm * Length of table top (Return Frame)± 10mm NA FOR RECTANGULAR NA FOR RECTANGULAR Depth of table top ± 10mm 600 mm 600 mm Height of table top ±10mm 750 mm * Thickness of table top ±2mm 25 mm * Overall height of work station partition ±10mm 1200 mm 1200 mm Thickness of side partition/panel ±2mm 15 mm 15 mm Thickness of main frame ±5 mm 70 mm 70 mm Size of drawer unit ( WidthXDepthXHeigh t) ±10mm 450 X 590 X 147 (mm) 390 X 440 X 147 (mm)
Required390 X 590 X 147 (mm)
Required450 X 440 X 147 (mm)
Required450 X 590 X 147 (mm)
RequiredNO DRAWER UNIT
Required390 x 440 x 160 (mm)
Required400 X 470 X 130 (mm) Size of file box (Widt hXDepthXHeight) ±10mm NO FILE BOX 390 X 440 X 296 (mm)
Required390 X 590 X 296 (mm)
Required450 X 440 X 296 (mm)
Required450 X 590 X 296 (mm)
RequiredNO FILE BOX
Required390 x 440 x 260 (mm)
Required400 X 470 X 330 (mm) FINISH Powder coating thickness of frame 50 micron * CERTIFICATION Test reports to be furnished to buyer on demand YES * BIFMA level-3 NO * 3/5 OEM of offered product is ISO 9001:2015 certified NO * OEM of offered product is ISO 14001:2015 certified NO * OEM of offered product is ISO 18001:2007 certified NO * Green guard certification NO * WARRANTY Warranty period in number of years 1 1
Required2
Required3
Required4
Required5 INSTALATION COMMISSIONING INSTALLATION COMMISSIONING The price includes the cost of installation and commissioning of the entire unit at consignee site (excluding the cost of Civil Work which would be got done by the Consignee at his own cost as per design and layout plan provided by the seller). The price includes the cost of installation and commissioning of the entire unit at consignee site (excluding the cost of Civil Work which would be got done by the Consignee at his own cost as per design and layout plan provided by the seller). * Bold specifications are the golden parameters.