Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NAZRUL SARANI ASHRAMPARA SILIGURI | SILIGURI | COOCH BEHAR | WEST BENGAL | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 | HOWRAH | WEST BENGAL | 711110 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical KOLKATA 54 | KOLKATA | WEST BENGAL | 700054 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
19 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGR. (C ), BR-XIV
516, D. H. ROAD, KOLKATA-700034
MAINTENANCE OF BITUMINOUS PASSAGES BY REPAIRING OF POTHOLES, CRATERS, DEPRESSIONS AT DIFFERENT STRETCHES AT THE BYE LANES OF PARNASREE PALLY, NIVEDITA SARANI, K. D. M. ROAD ETC. IN WARD NO. 131.
2026_KMC_1041670_1
KMC/XIV/131/04/26-27/R
Open Tender
CIVIL WORKS
Percentage
90 days
WARD-131
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹6,000
21 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and
jungles when and where necessary.
(a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16
Page No.240) | 211.8 | SQUARE METER | 14.4 | ₹3,049.92 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including
spreading the spoils properly over the flank as necessary or on berm
to approximate grade & camber and rolling the sub-grade with power
roller to proper camber and grade as per direction and satisfaction of
Engineer-in-charge including uprooting and removing plants and
jungles when and where necessary.
(b) For each additional Depth of 150mm and part thereof. ( Ref :PWD
(Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | 211.8 | SQUARE METER | 19 | ₹4,024.2 |
| 3 | Labour for picking up existing metalled road surface to a specified
average depth, including screening and stacking the pavement
materials.
(a) For average depth up to 40 mm by manual means:
(i) Stone-metal surface. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.01
Page No.331) | 1,390.2 | SQUARE METER | 12.9 | ₹17,933.58 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding,
barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate.
The compaction factor for dry, clean sand may be taken as 0.835.
(The payment is to be made on the basis of finished compacted
volume).
(c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page
No.245 & page-222 sl. No-4) | 15.89 | CUBIC METER | 1,172.6 | ₹18,626.75 |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 211.8 | SQUARE METER | 361 | ₹76,459.8 |
| 6 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade
and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the
required density, as per Clause 404 of Specifications for Road &
Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal /
Laterite (63 mm to 45 mm) (Moorum replaced with course sand)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 &
page-222 sl. No- 1 & 5 (e)) | 15.89 | CUBIC METER | 2,596.83 | ₹41,250.64 |
| 7 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision).
(ii) On Granular surfaces treated with primer. (Using Bitumen
emulsion at the rate of 0.25 to 0.30 kg per sqm.) ( Ref :PWD (Rds &
Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No.
5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018,
pg-228 item-1.03 (i), Pg-230,Table-I, It-4,) | 1,632.4 | SQUARE METER | 10.33 | ₹16,862.69 |
| 8 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications
for Road & Bridge Works of MoRT&H (5th Revision).
(i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of
0.20 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page
No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2
of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i),
Pg-230,Table-I, It-4,) | 127.1 | SQUARE METER | 9.51 | ₹1,208.72 |
| 9 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture)
a) without paver finisher
i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the
year 2019-2020, As per present market Price, Rate appvd. By
D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution
MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar
no-02 of 2018-19 dtd.04.04.2018 ) | 1,759.5 | SQUARE METER | 41 | ₹72,139.5 |
| 10 | Sub Total | - | - | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TForm.pdf
Tender Documents • 0.39 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
BOQ_2557443.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .