Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹4.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical PURE SITALPUR PO BAHULA PS ANDAL PURE SITALPUR PO BAHULA PS ANDAL PURE SITALPUR PO BAHULA PS ANDAL SATGRAM BARDHAMAN 713322 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHMAN | WEST BENGAL | 713322 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | Karmakar Engineering Workshop L1 |
|---|---|---|---|---|
| 1.00Discription of items | ||||
| 2.00 | Dewatering & cleaning the stump of No-8 pit bottom | 2 | ls | 10,507.25 ₹21,014.5 |
| 3.00 | 1 (One) Reel new guide rope transporting from Colliery store to No-S pit surface & unwinding from reel & laying the same at surface. | 2 | ls | 26,997 ₹53,994 |
| 4.00 | Dismantling of 1(one) no's top cover clamp & 1(one) no's bottom cover clamp after new guide rope placing fitting tghe same. | 2 | ls | 24,082.5 ₹48,165 |
| 5.00 | Dismantling of pit bottom landing after new guide rope placing re fitting the same. | 2 | ls | 6,020.5 ₹12,041 |
| 6.00 | Dismantling of 1(one) no's old guide rope & lowering the same at Underground & cutting & placing at site. | 2 | ls | 26,997 ₹53,994 |
| 7.00 | 1(one) nos new guide rope lowering, placing & fitting & proper tensioning of guide rope. | 2 | ls | 53,994 ₹1,07,988 |
| 8.00 | 20mm x 100mm HT Nut bolt | 24 | nos | 121 ₹2,904 |
| 9.00 | U clamp | 10 | kg | 132 ₹1,320 |
| 10.00 | DA cylinder | 2 | nos | 4,620 ₹9,240 |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
2 Feb 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
changing of guide rope E-3 and W-1 side of no-8 pit of Bankola Colliery
2026_ECL_351660_1
ECL/GM/BA/E TENDER/25-26/ENM/248 Dt 23.01.2026
Open Tender
Electrical and Maintenance Works
30 days
Bankola Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,200
11 Feb 2026
23 Jan 2026
3 Feb 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
23 Jan 2026 - 26 Jan 2026
Dewatering & cleaning the stump of No-8 pit bottom
1 (One) Reel new guide rope transporting from Colliery store to No-S pit surface & unwinding from reel & laying the same at surface.
Dismantling of 1(one) no's top cover clamp & 1(one) no's bottom cover clamp after new guide rope placing fitting tghe same.
Dismantling of pit bottom landing after new guide rope placing re fitting the same.
Dismantling of 1(one) no's old guide rope & lowering the same at Underground & cutting & placing at site.
1(one) nos new guide rope lowering, placing & fitting & proper tensioning of guide rope.
20mm x 100mm HT Nut bolt
U clamp
DA cylinder
Oxygen cylinder
CMPF cost (limited to the amount paid as per labour payment certificate)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_364422.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid