Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 CrAccepted-AOC RGTPP KHEDAR HISAR HARYANA | HISAR | HARYANA | 125001 | ₹2.7 Cr | 1 | Accepted-AOC DUE TO LOWER SIDE |
| 2 | 2₹2.8 Cr+₹9.1 L (3.31%)Rejected-AOC H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹2.8 Cr+₹9.1 L (3.31%) | 2 | Rejected-AOC DUE TO HIGHER SIDE |
| 3 | 3₹3.1 Cr+₹34.2 L (12.5%)Rejected-AOC | ₹3.1 Cr+₹34.2 L (12.5%) | 3 | Rejected-AOC DUE TO HIGHER SIDE |
| 4 | 4₹3.2 Cr+₹46.0 L (16.7%)Rejected-AOC | ₹3.2 Cr+₹46.0 L (16.7%) | 4 | Rejected-AOC DUE TO HIGHER SIDE |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
7 Dec 2021, 2:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION NO 2 HISAR
Const of Add SS Tank 1 WTP 1point00 MLD RCC CWT Repair of Existing SS Tank PC BW and SS well Laying of 4inch 6inch 8inch id DI Pipe line including CIDI special OandM of WTP only for 6 yrs including 1 year defect liability period after 3 mnth trial
2021_HRY_198120_1
18603 dt 18.11.2021
Open Limited
Civil Works
Works
7 days
HISAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹5.4 L
Yes
1 Feb 2022
1 Dec 2021
7 Dec 2021
1 Dec 2021
7 Dec 2021
1 Dec 2021
Amount
Construction of 1.00 MLD Rapid Sand Filtration plant Comprising of Labor For DI Pipe from existing Raw water/ Pump, Inlet Box, Inlet channel, Alum Dozing, Flash Mixing, Tapered Flocculate, Rectangular setting tank, filter box, Over hear reservoir for back wash including pump sets and electric control penal, sluice valve houdi, Di Pipes , Di Specials Manhole Covers, air squer equipment, Chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respect as per DNIt . Labor rate for fixing DI, S/S class K9 ISI marked pipe including cost of DI specials/fitting. ISI marked PN 1.6 skuice valve including cost of excavation, layig, cutting, jointig,threading,and jointing material in horizontal length including connections complete in all respect. From existing raw water tank. NOTE - Di Pie will be supplied by the departmental free of cost ( BASED ON SCADA SYSTEM - 1.00 MLD WTP)
Operation and mantenence of WTP ccomplete scope of work ( Distiction Material Supplied by the PHED) as per schedule - iv for a period of 5 year after 12 months defect liability period and 3 months trial run period ( wil be charged to a/mtc. estimate. Complete in all respect. Operation and Maintenance during defect liability period (Operation only) after 3 months trial run period.
For 1st Year Operation and Maintenance after defect liability period
For 2nd Year Operation and Maintenance after defect liability period
For 3rd Year Operation and Maintenance after defect liability period
For 4th Year Operation and Maintenance after defect liability period
For 5th Year Operation and Maintenance after defect liability period
Bidder Name
Amount
Kulbir Singh Contractor(GSTN-06ATZPS6352H1ZW)
RAVI PARKASH CONTRACTOR(GSTN-06AJMPP2964K1ZN)
SATVIR SINGH CONTRACTOR(GSTN-06ABNPS8716P1ZO)
NAFE SINGH CONTRACTOR(GSTN-NA)
Kulbir Singh Contractor
RAVI PARKASH CONTRACTOR
SATVIR SINGH CONTRACTOR
Kulbir Singh Contractor
RAVI PARKASH CONTRACTOR
SATVIR SINGH CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .