| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC AOW | |
| 2 | L2₹2.4 L+₹34,092.54 (16.2%)Rejected-Finance AT MAIN ROAD KATHARA PO KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | L2 | Rejected-Finance Techno commercially rejected not being as L1 bidder | |
| 3 | L3₹4.1 L+₹2.0 L (97.1%)Rejected-Finance SON OF YADU MISTRY HIRAK ROAD HARINA NEAR HANUMAN MANDIR NAWAGARH BARORA DHANBAD DHANBAD 828306 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828306 | L3 | Rejected-Finance Techno commercially rejected not being as L1 bidder | |
| 4 | L4₹4.3 L+₹2.2 L (105.9%)Rejected-Finance AT SAWANG GOMIA BOKARO JHARKHAND 829128 | BOKARO | BOKARO | JHARKHAND | 829128 | L4 | Rejected-Finance Techno commercially rejected not being as L1 bidder | |
| 5 | L5₹4.4 L+₹2.3 L (108.7%)Rejected-Finance | L5 | Rejected-Finance Techno commercially rejected not being as L1 bidder |
Tender Value
₹5.0 L
EMD Value
₹6,231
Closing Date
24 Jun 2023, 11:00 amClosed
S. B. N. Singh
Office of Project Officer, Kathara Washery, Kathara Area
Re-stringing and maintenance of 33 KV O/H line incoming from regional sub-station to KTW sub-station and associated works under Kathara Washery
2023_CCL_281422_1
PO/KTW/EnM(OCP)/eTen/23-24/16
Open Tender
AMC WORKS
Item Rate
365 days
Kathara Washery
As per NIT
7 documents required · 7 mandatory
₹6,231
16 Oct 2023
13 Jun 2023
26 Jun 2023
14 Jun 2023
24 Jun 2023
14 Jun 2023
14 Jun 2023 - 20 Jun 2023
Amount
Erection of metallic pole / steel tubular pole of length exceeding 12 M but not exceeding 14 M in cement concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 graded stone aggregate 40mm nominal size) foundation including excavation and refilling etc as required.
Supplying and erection of stay galvanized stay set for 33KV over head line complete with 19/20 mm dia X 1.8M long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle (20mm X 600mm), 7/4.00 mm dia G.I. stay wire and 33KV strain insulator etc in cement concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 graded stone aggregate 40mm nominal size) foundation including excavation and refilling etc as required.
Supplying of channel iron 100MM X 50MM X 6MM (9.56 Kg Per Mtrs) pole top bracket/cross arm for single 33KV overhead line complete with 50mm x 06mm M.S flat iron clamps, bolts, nuts including drilling holes for insulator pins etc (as per drawing) and painting with primer and finished paint as required.
Supplying and erection of set of cross bracing FRL same work for 33KV over head line double pole structure having four members fabrication out of 65mm x 65mm x 6mm angle iron to form a rectangle of minimum size 2400mm width x 2800 mm height complete 50mm x 6mm M.S flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts, washer etc and painting with primer and finished paint as required.
Supplying of channel iron 100MM X 50MM X 6MM (9.56 Kg Per Mtrs) cross arm for two wire 33KV overhead line conductors complete with 50mm x 50mm x 6mm angle iron bracket welded to the channel iron and complete with 50mm x 6mm M.S flat iron clamps, bolts, nuts including drilling holes for insulator pins/fitting, bolts, nuts, washer etc and painting with primer and finished paint as required.
Supplying of channel iron 100MM X 50MM X 6MM (9.56 Kg Per Mtrs) cross arm for three wire 33KV overhead line conductors complete with 50mm x 50mm x 6mm angle iron bracket welded to the channel iron and complete with 50mm x 6mm M.S flat iron clamps, bolts, nuts including drilling holes for insulator pins/fitting, bolts, nuts, washer etc and painting with primer and finished paint as required.
Erection of double pole 03 wire cross arm for 11KV/22KV/33Kv over head lines as required
Erection of ACSR conductor DOG of 7/3.35mm to 7/4.00 diameter and above including binding etc as required. (5 SPN X 50 M X 3 Wire) = 750 Mtrs X 0.394 Kg / Mtrs. = 295.50 Kg. + 2% sagging + 2% binding & jumphering = 307.32 Kg.
Supplying and erection of 33KV pin insulator complete with large steel head G.I pin, nuts, washer etc as required.
Supplying and erection of a set of three 11KV disc insulator for 33KV overhead lines with galvanized insulator fittings ball and socket type and complete with galvanized strain clamps, bolts, nuts, washer etc. as required. (54 Nos. ÷ 03 Nos. per Set = 18 Sets)
Dismantling of pole / street light standard / strut embedded in cement concrete foundation etc. as required.
Dismantling of O/H lines comprising of copper/aluminum over head conductor G.I wire cross arms insulators etc as required.
Cradling : Erection of G.I Wire 8 SWG including binding etc. as required.
Cradling : Supply of G.I Wire 8 SWG
Providing and fixing of heavy duty PG clamb (3 nuts and bolts).
Total impact of GST for the purpose of CTC
M/S. PAWAN KUMAR
NEELAM ELECTRIC WORKS
SEMCO ENGINEERING WORKS
M/S VISHAL ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_291396.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .