Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC GAIRIBAS KALIMPONG | KALIMPONG | KALIMPONG | WEST BENGAL | 734301 | ₹34.0 L | L1 | Accepted-AOC 1st Lowest Bidder |
| 2 | L2₹34.3 LRejected-AOC | ₹34.3 L | L2 | Rejected-AOC 2nd Lowest Bidder |
| 3 | L3₹35.1 LRejected-AOC 0 73 JONSTONGANJ ALLAHABAD ALLAHABAD UTTAR PRADESH 211003 | PRAYAGRAJ | UTTAR PRADESH | 211003 | ₹35.1 L | L3 | Rejected-AOC 3rd Lowest Bidder |
Tender Value
₹34.0 L
EMD Value
₹67,980
Closing Date
20 Feb 2026, 6:00 pmClosed
Executive Engineer Kalimpong Irrigation Division
Upper Cart Road Raniban Kalimpong
River Bank Protection Work at Right Bank of Naxal Khola for Protection of Naxal Gaon in P.S. Jhalung..
2026_GTA_1000874_4
e-NIT No 17/EE/KID/GTA/2025-26
Open Tender
CIVIL WORKS
60 days
Naxal, Jhalung
Please refer tender documents
8 documents required · 8 mandatory
₹2,500
₹67,980
10 Apr 2026
7 Feb 2026
23 Feb 2026
7 Feb 2026
20 Feb 2026
7 Feb 2026
Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with disposal upto1000 mts. Excavation for road way in ordinary rock with hydraulic excavator of 0.90 Cu.m bucket capacity including cutting and loading in tippers, transporting to embankment site with in all lifts and lead upto 1000 mts. trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th. Revision). (Mode of measurement: Pre works and post works).
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).
Filling properly empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150 mts. etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulder sand launching the crate in position if necessary and as directed by the Engineer-in charge.
Cement concrete with 30 mm. down graded shingles excluding shuttering. N.B. Variety. In ground floor. (a). 1:3:6 proportion.
Hire and labour charges for shuttering with or without staging upto 4.0 mts. height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2452598.pdf
techsummary_2452598.pdf
finance_2452598.pdf
BOQ Comparative Chart
xlsx
finsummary_2452598.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
Tendernotice_2.pdf
PDF • 2.02 MB
Tendernotice_3.pdf
PDF • 0.04 MB
BOQ_2452598.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid