Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹31.6 L+₹5,061 (0.16%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹31.9 L
EMD Value
₹32,000
Closing Date
30 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development OfficeR Krishnagiri
The Block Development Office Krishnagiri
1. Krishnagiri DT Krishnagiri Block Under 15th FC 2023-2024 Strengthening of the Road from Krishnagiri _ Rayakottai Road to Anand Nagar at Peddathalapalli Panchayat Package No 2023-24 KGI 31
2023_RDTN_391831_1
RocNo_43_2023_DPSNo1_26_10_23
Open Tender
Civil Works - Roads
Item Rate
90 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹32,000
The Block Development Office Krishnagiri
1 Dec 2023
22 Nov 2023
30 Nov 2023
22 Nov 2023
30 Nov 2023
22 Nov 2023
28 Nov 2023
Amount
1. Strengthening of the Road From Krishnagiri - Rayakottai road to Anand Nagar Road KM 0/0-0/8 H/o Peddathalapalli (R -195) Rs. 31.85 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm Old Metalled surface and Sectioning -1Sqm
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Macadam based on job mix formula mixed in hot mix plant of drum type in one layer for overlay as shown in Drawing using paving Bitumen 60/70 Penetration Grade as per IS 73 and aggregates Conforming to Grading
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for H.M Stone
Provision for Name Board cum Citizen Information Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PAPPANAN CONTARCTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .