Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
20 Aug 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer West Division APHWCL
Upgradation of Police Station at Rupa
2026_APP_3642_1
APH/EC/EE(W)/E-NIT/2025-26
Open Tender
Civil Works
Item Rate
Rupa
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Executive Engineer West Division APHWCL
₹2.1 L
Executive Engineer West Division APHWCL
26 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 60 | Sqm | 100 | ₹6,000 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutters including chowkhats, architrave, hold fasts etc complete and stcking within 50 m lead. | 60 | Each | 100 | ₹6,000 |
| 3 | Dismantling cement, asbestos, celotax or other ceiling or partition hard board partition wall including stacking of serviceable materials and disposal of unserviceable materials within 50 m lead. | 1,600 | Sqm | 10 | ₹16,000 |
| 4 | Dismantling GI sheet roofing including ridges, hips, valleys and gutters etc and stacking the material within 50 m lead. | 1,200 | Sqm | 10 | ₹12,000 |
| 5 | Dismantling wood work of sectional area 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead. | 5.63 | Cum | 10 | ₹56.3 |
| 6 | Demolishing RCC work including stacking of steel bars and disposal of un-serviceable materials within 50 metres lead. | 15 | Cum | 10 | ₹150 |
| 7 | Demolishing cement concrete 1 : 3 : 6 or richer mix including disposal off material within 50 metres lead. | 9 | Cum | 10 | ₹90 |
| 8 | Earth work in rough excavation,banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankd banks, marginal banks and guide banks filling up grounddepressions lead upto 50mm and lift upto 1.50m. a). Ordinary Soil@70% | 840 | Cum | 10 | ₹8,400 |
| 9 | Hard Soil/Ordinary Rock@30% | 360 | Cum | 10 | ₹3,600 |
| 10 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 278.25 | Cum | 10 | ₹2,782.5 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
SBD_Rupa.pdf
Tender Documents • 3.78 MB
BOQ_3871.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .