Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹100.2 CrFinancial bid opened Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | ₹100.2 Cr | L1 | Financial bid opened |
| 2 | L2₹100.2 Cr+₹1.4 L (0.01%)Financial bid opened Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | ₹100.2 Cr+₹1.4 L (0.01%) | L2 | Financial bid opened |
| 3 | L3₹103.4 Cr+₹3.1 Cr (3.13%)Financial bid opened Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | ₹103.4 Cr+₹3.1 Cr (3.13%) | L3 | Financial bid opened |
| 4 | L4₹104.8 Cr+₹4.6 Cr (4.56%)Financial bid opened Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | ₹104.8 Cr+₹4.6 Cr (4.56%) | L4 | Financial bid opened |
| 5 | L5₹105.0 Cr+₹4.7 Cr (4.72%)Financial bid opened Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi. | ₹105.0 Cr+₹4.7 Cr (4.72%) | L5 | Financial bid opened |
| Sl No | Description | Qty | Unit | M/s Jai Prakash & Sons L5 | M/S KASANA BUILDERS PVT LTD L4 | KASHYAPI INFRASTRUCTURE PVT LTD L1 | VISHNU SARAN AND COMPANY L2 | M/S KBG ENGINERS L3 |
|---|---|---|---|---|---|---|---|---|
| 1 | SCOPE OF WORKS-
Construction of 1200 seater Girls Hostel with five hostel blocks (G+4) (Blocks A, B, C, D & E) and one Dining block (G+3) (Block F) including Water supply, Sanitary installation, Internal Electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS System, HVAC, Solar and development works at, BHU, Varanasi and making the buildings of 1200 seated Girls Hostel functional in all respects as per the architectural /structural drawings and specifications mentioned in the tender documents. | - | - | -26.77 ₹1,04,95,00,605.28 | -26.88 ₹1,04,79,24,132.97 | -30.07 ₹1,00,22,06,436.25 Lowest | -30.06 ₹1,00,23,49,751.92 | -27.88 ₹1,03,35,92,566.6 |
Tender Value
₹143.3 Cr
EMD Value
₹1.5 Cr
Closing Date
18 Oct 2023, 3:00 pmClosed
EE&SM( C) -2
ANIKET SINHA
O/o Executive Engineer and SM(C)-2, BHU Project Varanasi, CPWD, BHU, Varanasi-221005
Construction of 1200 seater Girls Hostel with five hostel blocks ( G plus 4) (Blocks A,B,C,D & E) and one Dining block (G plus 3) (Block F) including water supply, sanitary installation, Internal electric installations, Fire Fighting, Fire Alarm system, Lifts, CCTV, DG set, UPS system, HVAC, Solar and development works at BHU, Varanasi.
53703
09/EE/BHUPD-II/2023-24
OPEN
Civil Works - Buildings
NCB
18 months
Varanasi, Uttar Pradesh
13 documents required · 13 mandatory
₹1.5 Cr
Conference Hall, O/o Chief Engineer cum Executive Director, BHU Project, CPWD, Behind Central Office, BHU, Varanasi.
18 Oct 2023
13 Sept 2023
18 Oct 2023
18 Oct 2023
29 Sept 2023
3 Oct 2023
stage.html
html • 0.09 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
NIT+Part+A.pdf
document • 0.91 MB
NIT+Part+B.pdf
document • 2.50 MB
NIT+Part+C.pdf
document • 1.70 MB
NIT+Part+D+Financial+Quote.pdf
document • 0.02 MB
ANNEXURE+A+SOIL+REPORT.pdf
document • 6.40 MB
ANNEXURE+B+INDICATIVE+IMAGES+ART+WORK.pdf
document • 0.96 MB
ANNEXURE+C+Specification+for+SS+Door.pdf
document • 0.06 MB
Drawings+Architectural.zip
document • 37.96 MB
DRAWING+STRUCTURAL+PART1.zip
document • 37.01 MB
PHE+and+Fire+Fighting+Part1.zip
document • 24.36 MB
PHE+and+Fire+Fighting+Part2.zip
document • 21.88 MB
DRAWING+STRUCTURAL+PART2.zip
document • 38.72 MB
Drawings-HVAC.zip
document • 9.02 MB
Drawings+Landscape+part1.zip
document • 34.54 MB
Drawings+Landscape+part2.zip
document • 26.31 MB
Drawings+Electrical+Part1.zip
document • 37.33 MB
Drawings+Electrical+Part2.zip
document • 37.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .