Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC NEW MARKET SINGRAULI DISTT SINGRAULI MP 486889 | SINGRAULI | SINGRAULI | MP | 486889 | L1 | Accepted-AOC As per TCR | |
| 2 | L2₹6.2 L+₹13,744.60 (2.27%)Rejected-Finance BINA ROAD PARASI PO KAKRI DISTT SONEBHADRA UP PIN 231220 | KAKRI | SONEBHADRA | UP | 231220 | L2 | Rejected-Finance As per NIT | |
| 3 | L3₹9.2 L+₹3.2 L (52.4%)Rejected-Finance AURI BEHIND SAHARA INDIA PO ANPARA DISTT SONEBHADRA UP 231225 | ANPARA | SONEBHADRA | UP | 231225 | L3 | Rejected-Finance As per NIT |
Tender Value
₹10.8 L
EMD Value
₹13,555
Closing Date
5 Apr 2023, 9:00 amClosed
Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Realignment / extension of HT OH line in coal section for feeding power to HT pumps and providing earthpits for pump/ motor/ starter/Field switches to be installed in sump and repair and maintenance of 33kV/6.6kV/3.3kV HT Overhead line of mine area
2023_NCL_275954_1
B/EM/eTender/2022-23/31 Dt. 18.03.2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Bina project
Please refer Tender documents.
6 documents required · 6 mandatory
₹13,555
3 May 2023
20 Mar 2023
7 Apr 2023
20 Mar 2023
5 Apr 2023
21 Mar 2023
20 Mar 2023 - 28 Mar 2023
Amount
Supply of cement 1/2 bags per pole & 1/2 bags per stay.
Supply of stay wire 7/10 SWG
Supply of earth wire 7/14SWG
Supply of pin insulator 33kV
Supply of disc insulators 11kV
Supply of Lightening arrestor 7.2kV,10kA with insulating base
Making earth pit as per IER including supply of required materials. ( 70% supply & 30% labour)
Dismantaling of AAA 148 sqmm conductor including insulators.
Dismantaling of earth wire.
Dismantling of DC cross arm.
Digging of rail / tubular pole 11/13/16 mtr long
Painting of pole ( 13mtr/16 mtr long) area 4.53 sqm for 13 mtr poleX 180 nos. & 6.52 sqm for 16 mtr pole X 37 nos.) )
Letter writing on pole ( 11 letter per pole X 175 nos. X 10cm size)
Collection of rail / tubular pole 11/13/16 mtr long
Erection of rail / tubular 11/13 mtr long including digging of earth pit & concreting with mine bolder, pole pit size 0.6X0.6X1.6 Mtr.
Erection of rail / tubular 16 mtr long including digging of earth pit & concreting with mine bolder, pole pit size 0.6X0.6X 2.2 Mtr.
Fixing of stay including digging of earth pit & concreting with mine bolder, pole pit size 0.6X0.6X2.1.2 Mtr.
Fixing of DC cross arm.
Fixing of guarding bracket
Fixing of stay wire 7/10SWG with stay insulator.
Fixing of disc insulator 11Kv grade.
Fixing of pin insulator 33KV/11KV//6.6KV grade.
Stringing of AAA 148 sqmm conductor
Stringing of earth wire 7/12SWG or 7/14 SWG
Fixing of PG clamp/ jumpering
Fixing of bracket in single pole.
Fixing of top bracket in single pole.
Erection of lightening arrestor
Total impact of GST for the purpose of CTC
M/s M. B. Brothers
M/s HARIHAR SINGH ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_285645.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .