| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | ₹5.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.9 LSame as L1Rejected-AOC | ₹5.9 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹5.9 L
EMD Value
₹5,900
Closing Date
22 Apr 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of road and RCC drain with cover slab from Paramananda Behera res to Devi Prasad Das res at Majhi Sahi, Tower gali Jobra in Ward No.40.
2026_ORULB_127812_3
MC(CMC)CTC_Div-IIiNo1/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹5,900
Yes
10 Aug 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
22 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling and removing old cement concrete including stacking the useful materials for reuse & removing the debris within 50m lead etc. as per the direction of engineer in charge. | - | Cum | - | - |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of all labour, T&P etc. as per the direction of engineer in charge. | - | Cum | - | - |
| 3 | Providing cement concrete for unreinforced cement concrete works of proportion (1:4:8) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost. | - | Cum | - | - |
| 4 | Providing & laying CC(1:2:4)) in road work using 12mm size screened,washed hard black crusher broken granite of approved quality with centering & shuttering including cost, conveyance, royality and taxes of all materials , cost of all labour,T&P etc. as per the direction of EIC. | - | Cum | - | - |
| 5 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S . 516using 12mm to 20mm | - | Cum | - | - |
| 6 | Rigid smooth centering and shuttering for R.C.C work including false work and dismantling after casting including cost of all labour, materials, T&P required etc. as per the direction of Engineer in charge. | - | Sqm | - | - |
| 7 | Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/ bent up MS Rods / Tor Steel/deformed rods etc. inchting hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required | - | Qntl | - | - |
| 8 | Providing & laying of Concrete paver block (80cm thick)of different size M-20 grade of concrete over 50mm thick compacted sand layer including cost ,conveyance & royality of all material etc. | - | Sqm | - | - |
| 9 | Remove excavated & dismantled materials from the site by mechanical means with loading and unloading the same within 5 kms lead as per | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587775.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_587775.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .