| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.7 LAccepted-AOC | ₹39.7 L Quoted ₹28.3 L | L1 | Accepted-AOC Accept |
| 2 | L2₹29.1 LRejected-AOC | ₹29.1 L | L2 | Rejected-AOC Reject |
| 3 | L3₹29.3 LRejected-AOC RM 4 SAHJEEVAN HOC G BLOCK MIDC SHAHUNAGAR KSB CHOWK CHINCHWAD PUNE 411019 | PUNE | PUNE | MAHARASHTRA | 411019 | ₹29.3 L | L3 | Rejected-AOC Reject |
| 4 | L4₹30.5 LRejected-AOC PLOT NO 45 GUT NO 140 VIVEKANANDA NAGAR NEAR CIDCO WATER TANK NAGAR I CIDCO WALUJ MAHANAGAR 431133 | AURANGABAD | AURANGABAD | MAHARASHTRA | 431133 | ₹30.5 L | L4 | Rejected-AOC Reject |
| 5 | L5₹32.6 LRejected-AOC | ₹32.6 L | L5 | Rejected-AOC Reject |
Tender Value
₹39.7 L
EMD Value
₹39,800
Closing Date
2 Jun 2026, 11:00 amClosed
Executive Engineer MIDC IT Pune
4th floor jog Centre Building, Near Vodafone Building, Wakadewadi, Pune 03
IT ADDL PUNE INFOTECH PARK 2 INDUSTRIAL AREA Rajiv Gandhi Infotech Park Hinjawadi ph 2 M and R to Roads Providing and laying 900mm and 600mm RCC line along the road near Shell petrol pump and other allied work
2026_MIDC_1304083_1
22B/2026
Open Tender
Civil Works
Percentage
Hinjawadi
Please refer Tender documents.
9 documents required · 9 mandatory
₹10,030
₹39,800
26 Aug 2026
18 May 2026
3 Jun 2026
18 May 2026
2 Jun 2026
27 May 2026
18 May 2026 - 22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspec- tion charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. Note :One collar should be supplied with each full length plain ended RCC pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below. Note :Only 85% rate is payable till satisfactory hydraulic testing is given. C lass NP-III (For 2.00 m. length) Coller Joints.12) 600 mm. | 200 | Running Meter | 3,079 | ₹6,15,800 |
| 1.02 | 15) 900 mm. Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M. | 180 | Running Meter | 5,760 | ₹10,36,800 |
| 1.03 | As above of 1.2 x 1.2 M internal size and depth upto 1.2 M with precast R.C.C slab cover. Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 1/259) | 16 | Number | 18,237 | ₹2,91,792 |
| 1.04 | Lift 0 to 1.5 M. Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) | 61.2 | Cubic Meter | 165 | ₹10,098 |
| 1.05 | Lift 0 to 1.5 M . Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in- charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) | 306 | Cubic Meter | 1,119 | ₹3,42,414 |
| 1.06 | Lift 0 to 1.5 M. Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all c lass of pipes.) as per IS- 783-1985. | 244.8 | Cubic Meter | 629 | ₹1,53,979.2 |
| 1.07 | Coller Joints. 2) 600 mm. | 200 | Running Meter | 497 | ₹99,400 |
| 1.08 | 15) 900 mm. | 180 | Running Meter | 717 | ₹1,29,060 |
| 1.09 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | 29 | Cubic Meter | 7,183.08 | ₹2,08,309.32 |
| 1.1 | Providing and laying Cast in situ/Ready Mixcement concrete in M20 of trap/ granite/quartzite/gneiss metal for steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | 71 | Cubic Meter | 7,517.15 | ₹5,33,717.65 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
ItemSpecification.pdf
Other Document • 0.01 MB
TenderDocument.pdf
Tender Documents • 0.36 MB
Tender.pdf
Additional Documents • 0.60 MB
BOQ_2238848.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].