Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
23 Jun 2026, 6:00 pm
Executive Engineer PWD Divison Gandoh
Executive Engineer PWD Divison Gandoh
Macadamization of Hanoo Tilogra Road from Km 1.30 onwards under Cities and Towns 2026-27
2026_PWDJK_312224_2
E_NIT 11 of 2026-27
Open Tender
Civil Works
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Divison Gandoh
₹40,000
12 Jun 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
12 Jun 2026 - 19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of subgrade by excavating earth to an average of 22.5 cm
depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters | 1,075.8 | Sqm | 153 | ₹1,64,597.4 |
| 2 | Supply and staking at site Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required denisity . Graded Crushed stone aggregate of size 90mm to 45mm | 295.85 | Cum | 1,972.3 | ₹5,83,504.96 |
| 3 | Supplying and stacking at site stone screening of size 13.2mm nominalk size (Type A) | 57.24 | Cum | 1,204.15 | ₹68,925.55 |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade –VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications On W.B.M. @ 0.75 Kg/sqm | 1,183.38 | Sqm | 74.35 | ₹87,984.3 |
| 5 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 16.63.1 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity 50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | 59.17 | cum | 8,590.95 | ₹5,08,326.51 |
| 6 | 2.5 cm premix carpet surfacing with 1.8cum and 0.90 cum of stone
chippings of 13.2 mm size and 11.2 size respectively, per 100 sqm and 52kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete ( Incl. tack coat) With paving Asphalt grade VG-10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt | 1,183.38 | Sqm | 269.85 | ₹3,19,335.09 |
| 7 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cumof fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete | 1,183.38 | Sqm | 101.4 | ₹1,19,994.73 |
| 8 | Filling of excavated available earth | 65.2 | Cum | 218.4 | ₹14,239.68 |
| 9 | Carrige of stone aggregate above 40mm nominal size and above incl. Loading unloading and stacking at an average distance of 15.00 Km by MT | 188.26 | Cum | 374.49 | ₹70,501.49 |
| 10 | Carrige of stone aggregate below 40mm nominal size and above incl. Loading unloading and stacking at an average distance of 26.00 Km by MT | 137.91 | Cum | 476.18 | ₹65,669.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.81 MB
BOQ_1010669.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid