| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹11.3 L+₹85,780 (8.19%)Accepted-Finance | L2 | Accepted-Finance Qualified | |
| 3 | L3₹15.7 L+₹5.2 L (49.4%)Accepted-Finance | L3 | Accepted-Finance Qualified |
| Sl No | Description | Qty | Unit | Vivek Electricals L2 | NEHA ENTERPRISES L3 | AYAAN ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 0.00d | ||||||
| 1.00Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx. | ||||||
| 2.00 | Pcc Pole 8.5 Mtr Long | 27 | Nos. | 500 ₹13,500 | 750 ₹20,250 | 400 ₹10,800 Lowest |
| 3.00 | Carriage of ACSR Weasal, LT AB Cable, Connecting Lead, 11 KV Disc Insulator with fitting & 11 KV Pin insulator with fitting, 11 KV pin insulator with pin, Distribution box, Stay set Complete with wire. Etc as per RESPO Norms. | 30 | Qtl | 2,500 ₹75,000 Lowest | 2,750 ₹82,500 | 3,000 ₹90,000 |
| 4.00 | 10 KVA Transformer | 9 | Nos. | 1,500 ₹13,500 Lowest | 1,750 ₹15,750 | 2,500 ₹22,500 |
| 5.00 | 63 KVA Transformer | 1 | Nos. | 2,000 ₹2,000 Lowest | 2,250 ₹2,250 | 3,000 ₹3,000 |
| 6.00 | 250 KVA Transformer | 5 | Nos. | 4,000 ₹20,000 Lowest | 4,250 ₹21,250 | 5,500 ₹27,500 |
| 7.00 | 11 KV TPMO | 5 | Nos. | 1,500 ₹7,500 | 1,750 ₹8,750 | 50 ₹250 Lowest |
| 8.00 | 11 KV Fuse Set | 1 | Nos. | 1,000 ₹1,000 | 1,250 ₹1,250 | 50 ₹50 Lowest |
| 9.00 | 11 KV DO Fuse Set | 5 | Nos. | 1,000 ₹5,000 | 1,250 ₹6,250 | 50 ₹250 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,500
Closing Date
16 Sept 2025, 11:00 amClosed
SE, EDC-II, BULANDSHAHR.
SE, EDC-II, BULANDSHAHR.
Work of installing additional transformers to remove overloading of distribution transformers at various 33/11 kV power substations in Business Plan 2025-26 under EDD-Sikandrabad, Bulandshahr.
2025_PVVNL_1069568_1
T-29/EDC-II/BSR/25-26
Open Tender
Electrical Works
Lump-sum
30 days
BULANDSHAHR
Work of installing additional transformers to remove overloading of distribution transformers at various 33/11 kV power substations in Business Plan 2025-26 under EDD-Sikandrabad, Bulandshahr.
2 documents required · 2 mandatory
₹3,540
SE, EDC-II, BULANDSHAHR
₹11,500
24 Sept 2025
29 Aug 2025
16 Sept 2025
29 Aug 2025
16 Sept 2025
29 Aug 2025
Amount
Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
Pcc Pole 8.5 Mtr Long
Carriage of ACSR Weasal, LT AB Cable, Connecting Lead, 11 KV Disc Insulator with fitting & 11 KV Pin insulator with fitting, 11 KV pin insulator with pin, Distribution box, Stay set Complete with wire. Etc as per RESPO Norms.
10 KVA Transformer
63 KVA Transformer
250 KVA Transformer
11 KV TPMO
11 KV Fuse Set
11 KV DO Fuse Set
LT PVC Cable All. 3.5x70 sq mm
Providing and Fixing of the following material by the Contractor as per UPPCL/RESPO Rules.
LT Telless Unit with Box & with 2 No. LT line circuit arrengment with all accessories as per uppcl Norms & Site Requirment.
LT Fuse Unit with Box & all accessories as per uppcl Norms & Site Requirment.
MS Channel (Dropper) 100x50x2028 mm (for Fuse Set)
Suspention Clamp
Dead end Clamp
J-Hook
LT Piercing Connector for 120 sq mm
Stone pad 300x300x75 mm
T-off Channel for LT with Clamp
MS Angle 75x75x6x2028 mm with clamp & Bolt and nut
MS Top Channel (125x65x2240 mm)
MS Channel 125x65x1300 mm (T-off)
T/F Holding Clamp
All Lug long barrel as per site requirment
Holding Clamps for top channel TPMO & Fuse set etc. with bolts & nuts.
Danger Board with Clamps
Barbed wire G.I. (1.5 Kg per Pole)
Concreting of Pole
Earthing Rod Complete with wire
Clamps for D.B. (40x6 mm)
The following meterial Erection & Fixing as per RESPO manual. It including the cost of labour, T&P, Carrier etc. required for proper completion of work.
PCC pole 8.5 Mtr. Long with all accessories for LT AB Cable & ACSR Weasal Conductor
Making of D/P for T/F on PCC pole 8.5 Mtr. Long.
Grouting concreting & Plinthing of Pcc Pole as per RESPO norms.
Fixing erection & grouting of Stay set complete with binding & Nozzling of Stay wire.
Earthing of supports with the help of Earthing rod & GI wire/Earth wire.
Making of Plinth of 250 KVA Transformer as per uppcl Norms & Site Requirment.
Chemical Earthing of 250 KVA T/F (Nutral) as per uppcl Norms & Site Requirment.
Fencing of 250 KVA T/F as per uppcl Norms & Site Requirment.
Laying stringing & sagging of LT XLPE Cable All. 1x400 sq mm
Laying stringing & sagging of Weasal conductor in 3 phase
Laying stringing & sagging of Connecting Lead for Distribution 1x16 sqmm
Laying stringing & sagging of AB Cable (3X120 + 1X95+1X16) sq.mm
Laying stringing & sagging of LT PVC Cable All. 3.5x70 sq mm
Installation of 10 KVA Transformer
Installation of 63 KVA Transformer
Installation of 250 KVA Transformer
Fixing & Installation of T.P.M.O. with all accessories as per Uppcl Norms
Fixing & Installation of Fuse Set/D.O. Fuse Set with all accessories as per Uppcl Norms
Installation of Distribution Box
All work will be done as per UPPCL/RESPO Rules.
Vivek Electricals (BID ID -5534306)
NEHA ENTERPRISES (BID ID -5536325)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .