Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAdmitted-Finance | ₹26.1 L | L1 | Admitted-Finance |
| 2 | L2₹26.4 LAdmitted-Finance | ₹26.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bittu Enterprises L2 | JYOTI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. | |||||
| 2.00 | Nominal bore 150 mm dia. | 1 | Mtr | 903.55 ₹903.55 | 894.6 ₹894.60 |
| 3.00 | Nominal bore 200 mm dia. | 1 | Mtr | 1,384.41 ₹1,384.41 | 1,370.7 ₹1,370.70 |
| 4.00 | Nominal bore 250 mm dia. | 1 | Mtr | 1,619.84 ₹1,619.84 | 1,603.8 ₹1,603.80 |
| 5.00 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | Mtr | 1,592.06 ₹1,592.06 | 1,576.3 ₹1,576.30 |
| 6.00 | Add 40% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | Mtr | 1,938.17 ₹1,938.17 | 1,918.98 ₹1,918.98 |
| 7.00Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. | |||||
| 8.00 | Nominal bore 200 mm dia. | 1 | Mtr | 1,120.8 ₹1,120.80 | 1,109.7 ₹1,109.70 |
| 9.00 | Nominal bore 250 mm dia. | 1 | Mtr | 1,263.51 ₹1,263.51 | 1,251 ₹1,251 |
| 10.00 | Add 15% extra on above item (Item No 2.2.1 to 2.2.2) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr . | 1 | Mtr | 1,288.92 ₹1,288.92 | 1,276.16 ₹1,276.16 |
Updated dates
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
23 Apr 2026, 6:00 pmClosed
ADMINISTRATOR
GRAM PANCHAYAT LEDOR KALAN
Annual Rate Contract for Handpump/Tubewell Construction and Other Material Supply for All Other Schemes for Gram Panchayat Ledor Kalan, PS Masalpur
2026_PRD_550766_1
01/2026-27
Open Tender
Construction Works
365 days
LEDOR KALAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS PER TD
₹60,000
Yes
30 Apr 2026
9 Apr 2026
24 Apr 2026
9 Apr 2026
23 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. | - | - | - | - | item01 |
| 2 | Nominal bore 150 mm dia. | - | Mtr | - | - | item02 |
| 3 | Nominal bore 200 mm dia. | - | Mtr | - | - | item03 |
| 4 | Nominal bore 250 mm dia. | - | Mtr | - | - | item04 |
| 5 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | - | Mtr | - | - | item05 |
| 6 | Add 40% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr . | - | Mtr | - | - | item06 |
| 7 | Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. | - | - | - | - | item07 |
| 8 | Nominal bore 200 mm dia. | - | Mtr | - | - | item08 |
| 9 | Nominal bore 250 mm dia. | - | Mtr | - | - | item09 |
| 10 | Add 15% extra on above item (Item No 2.2.1 to 2.2.2) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr . | - | Mtr | - | - | item10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TD.pdf
Tender Documents • 11.61 MB
BOQ_981567.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid