Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-Finance OFFICE NO 126 127 PLOT NO GP 185 186 SECOND FLOOR KOHINOOR MAJESTIC CHINCHWAD PUNE 19 PUNE MAHARASHTRA INDIAN 411019 | PUNE | MAHARASHTRA | 411019 | ₹20.0 L | L1 | Accepted-Finance OK |
| 2 | L2₹20.5 L+₹46,419.99 (2.32%)Accepted-Finance | ₹20.5 L+₹46,419.99 (2.32%) | L2 | Accepted-Finance OK |
| 3 | L3₹20.7 L+₹70,919.99 (3.55%)Accepted-Finance AT RAJAPE POST AMBIVALI TAL KARJAT DIST RAIGAD | KARJAT | RAIGAD | MAHARASHTRA | ₹20.7 L+₹70,919.99 (3.55%) | L3 | Accepted-Finance OK |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
22 May 2026, 6:00 pmClosed
Executive Engineer Zilla Parishad Raigad Alibag
Kuthebag Raigad Zilla Parishad Alibag
CONSTRUCTION OF CHANDAKE ADIWASIWADI ROAD TAL POLADPUR DIST.RAIGAD
2026_RAIGA_1301518_3
ZP-RAIGAD-WORKDIV-21-2026-27
Open Tender
Civil Works
Percentage
180 days
Tal-Karjat Dist.Raigad
RZP Registration Contractor AS PER TENDER(OPEN)
12 documents required · 12 mandatory
₹590
₹20,000
11 Jun 2026
8 May 2026
25 May 2026
8 May 2026
22 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No 1:- Providing dry/ trap/ granite/quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.
As Per Rate Analysis No. 1 | 186.78 | CMT | 1,984.69 | ₹3,70,700.4 |
| 2 | Item No 2:- Providing and laying in-situ M 20 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a | 147.45 | CMT | 8,406.76 | ₹12,39,599.22 |
| 3 | Item No. 3:- Providing and fixing 60 cm x 45 cm Marble plate engraving 10 cm. height letter, figures including painting the lefters/figures with | 0.27 | CMT | 4,204.2 | ₹1,135.13 |
| 4 | Item No 4:- Vigilance and quality control charges Compressive strength of c.c. cube (3 set of cube) | 2 | RMT | 690 | ₹1,380 |
| 5 | Item No 5:- Reimbrsement of royalty charges for sand | 63.15 | NO | 237.37 | ₹14,989.92 |
| 6 | Item No 6:- Reimbrsement of royalty charges for other materials | 215.19 | NO | 216.18 | ₹46,520.15 |
| 7 | LABOUR INSURANCE | 1 | JOB | 8,098.88 | ₹8,098.88 |
| 8 | SQM CHARGES | 1 | JOB | 16,197.76 | ₹16,197.76 |
| 9 | Add 18% GST | - | Total Amount | 0.18 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
BOQ_2234893.xls
BOQ • 0.24 MB
S2.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .