| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.0 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹56.4 L+₹2.4 L (4.38%)Rejected-Finance | L2 | Rejected-Finance RATE QUOTED ABOVE LOWEST BIDDER | |
| 3 | L3₹68.2 L+₹14.1 L (26.2%)Rejected-Finance VILL UPAR JAMBAD POST AHARRAH P S ARSHA DIST PURULIA PIN 723154 W B OFFICE BHAWANI COMPLEX BASEMENT 6 B T GARKAR ROAD PURULIA W B | PURULIA | PURULIA | WEST BENGAL | 723154 | L3 | Rejected-Finance RATE QUOTED ABOVE LOWEST BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹53.0 L
EMD Value
₹1.1 L
Closing Date
30 Oct 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer(A-M)
OFFICE OF THE EXECUTIVE ENGINEER AGRI MECHANICAL BANKURA AGRI MECHANICAL DIVISION ADMINISTRATIVE BUILDING PRANABANANDA SARANI PO KENDUADIHI DIST BANKURA PIN 722102 TEL 03242 243607
New Excavation of Water Detention Structure SURMANAGAR, Mouza MOTHURA , Block- ONDA in the district of Bankura under JALATIRTHA (PH-VII) PROGRAM 2021-2022
2021_WRDD_345218_1
WRIDD/EEAM/BNKDN/eNit39/JLT
Open Tender
CIVIL WORKS
Item Rate
90 days
Bankura
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.1 L
7 Feb 2022
27 Sept 2021
2 Nov 2021
27 Sept 2021
30 Oct 2021
27 Sept 2021
180 days
Amount
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Excavation in ordinary soil / mixed soil i.e. clay mixed with moorun , kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator or any other means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1000 m including spreading , leveliing disposed spoils at disposed area. mode of measurement : pre work and post work) Total excavated earthwork:-50548.00 Cum 25% of Total excavated earthwork:-12637.00Cum
Excavation in gravel/ moorum/kankar/compact moorum very much weathered rock/sticky soil mixed with moorum or ghooting for WDS/WHS/Reservoir /SFMIS etc with hydraulic excavater of required bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/disposal site within all lifts and leads upto 1500m including spreading, levelling disposed spoils at disposed area(mode of measurement : pre-work and post-work) 60% of Total excavated earthwork:-30328.8 Cum
Excavation in soft weather rock/ soft laterite rocks for WDS/WHS/Reservoir /SFMIS etc with hydraulic excavater of required bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/disposal site within all lifts and leads upto 1500m including spreading, levelling disposed spoils at disposed area(mode of measurement pre-work and post-work) 15% of Total excavated earthwork:-7582.20Cum
Extra rate for each 250 m. or part thereof above the initial lead of 1 k.m.over item No.2&3. 20% of earthwork with lead of 1 Km upto 1.25 Km.
Embankment:- Excavation in ordinary soil/ mixed soil i.e clay mixed with moorum, kankar,pebbles/silt dry or moist/slushy silt/sticky soil for WDS/WHS/Reservoir /SFMIS etc with hydraulic excavater of required bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/disposal site within all lifts and leads upto 1500m including spreading, levelling disposed spoils at disposed area(mode of measurement : pre-work and post-work) Total excavated earthwork:-2568.00 Cum 90% of Total excavated earthwork:-2311.20 Cum
Excavation in gravel/ moorum/kankar/compact moorum very much weathered rock/sticky soil mixed with moorum or ghooting for WDS/WHS/Reservoir /SFMIS etc with hydraulic excavater of required bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/disposal site within all lifts and leads upto 1500m including spreading, levelling disposed spoils at disposed area(mode of measurement : pre-work and post-work) 10% of Total excavated earthwork:-256.80Cum
Construction of embankment by earth moving machinery with approved materials already deposited at site available from river bed cutting and excavation from drain and foundation of other structures as per given profile for formation of bank and as per directon of the Engineer-incharge.(Payment will be made on the basis of Pre-work & Post-work level after necessary void deduction). Over item no. 6 &7 Total:-2282.67 Cum
Turfing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope, crest berm etc. of embankments, canals and drainage channels etc. within a lead of 150 metre and all lifts including fine dressing, watering, ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grass only).
Extra rate over additional lead of 75 metre or part thereof beyond the initial lead of 150 metre upto 750 metre.
Outlet Structure(3Nos):-Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Providing and laying of RCC pipe NP3 600mm dia as per rate analysis
Construction of display board made with 250mm thick 1st class brick work in cement mortar (4:1) of size 1500mmx1200mm,foundation consisting of 150mm thick sand filling below the jhama brick flat soling,13mm thick(4:1) both side cement plaster up to G.L,painting with best quality synthetic enamel paint of approved make & brand including painting block letters & digits(Size above 4 cm & up to 5cm) with black japan or any approved paint as per direction of E.I.C in accordance with supplied specific approved drawing including necessary earth work in excavation in all sorts of soil,filling in foundation with earth in all respect with all costs of labour and materials.
FALGUNI NANDI
ARABINDA MUSIB
ASHOKE KUMAR MAJHI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .