| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹2.0 L+₹58,389 (41.4%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹2.0 L+₹60,889 (43.1%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED | |
| 4 | L4₹2.5 L+₹1.1 L (77.9%)Accepted-Finance | L4 | Accepted-Finance QUALIFIED |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
19 Dec 2023, 11:00 amClosed
SE, EDC-III, BULANDSHAHRAC
SE, EDC-III, BULANDSHAHRAC
MOUNTING OF 01 NO 10 MVA TRANSFORMER TO SITE UNDER EDD DIBAI.
2023_PVVNL_866062_2
61/EDC-III/B/2023-2024
Open Tender
Electrical Works
Lump-sum
30 days
BULANDSHAHR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE, EDC-III, BULANDSHAHR
₹2,000
30 Dec 2023
13 Dec 2023
19 Dec 2023
13 Dec 2023
19 Dec 2023
13 Dec 2023
Amount
fo|qr forj.k [k.M&fMckbZ ds vUrxZr 132@33@11 ds0oh0 fo|qr midsUnz fMckbZ ij LFkkfir 01 ua0 10 ,e0oh0,0 ikoj ifjorZd mfpr LFkku ij LFkkfir djus dk dk;ZA
Removal of Pale Fencing in the switch yard of 33/11 KV & Re-fixing the pale fencing after completion of work.
Removal of 33 KV bar bar from 33 KV bushing after nuts & bolts etc.
Cutting of earthing MS. Flat from 01 no. 10 MVA T/F at 33/11 KV by gas cutter by manual labour.
Drain out of T/F Oil in Drums from 01 no. 10 MVA T/F at 33/11 KV including providing 20 No. Emplty Drums.
Removal of Rediators & Conservator Tank from 01 no. 10 MVA T/F at 33/11 KV S/S.
Safely Shifting of 01 no. 10 MVA T/F after removal from plinth to outside the switch yard step by using rail pieces and sleepers and manual labour at 33/11 KV S/S.
Safely Shifting of 01 no. 10 MVA T/F from outside the 33/11 KV S/S to inside the switch yard & mounting/installation on the plinth by crane and manual labour from unloading place of Plinth
Safely fixing radiators of 01 no. 10 MVA T/F crane and manual labour.
Safely fixing of conservator tank of 01 no. 10 MVA T/F crane and manual labour.
Earthing of power T/F 01 no. 10 MVA at 33/11 KV S/S after boaring & lowering of Global GI Pipe of Power Converters installed 1.25 inch diameter, Pipe thickness 0.4 inch ground water level. 120 Feet to 130 Feet depth, solid earting
Above work shall be done as per UPPCL/RESPO Rules.
C B S ENTERPRISES
A K ELECTRICAL ENG WORKS
FK MECHANICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .