Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹6.8 L+₹49,868.48 (7.95%)Accepted-Finance | 2 | Accepted-Finance 2 | |
| 3 | 3₹7.1 L+₹83,237.13 (13.3%)Accepted-Finance | 3 | Accepted-Finance 3 | |
| 4 | 4₹7.3 L+₹98,477.62 (15.7%)Accepted-Finance | 4 | Accepted-Finance 4 |
Tender Value
₹8.0 L
EMD Value
₹24,060
Closing Date
3 Mar 2026, 4:00 pmClosed
Executiave Engineer Jal Shakti PHE Div. Bijbehara
Executiave Engineer Jal Shakti PHE Div. Bijbehara
Establishment creation of 63 KVA electric sub station of WSS Chittergul under NABARD.
2026_PHE_304372_3
49/PHE/BIJ OF 2025-26
Open Tender
Civil Works - Water Works
Percentage
chittergul
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executiave Engineer Jal Shakti PHE Div. Bijbehara
₹24,060
Yes
5 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
25 Feb 2026 - 3 Mar 2026
63 KVA, 11/0.433KV, 3-phase Distribution Transformers (level-II) with Bimetallic Terminal connection and with LV Cable box having detachable Aluminium Gland Plate. Transformer should be arranged for vertical takeoff. Including all required Certifications required by PDD department for connection, including all charges required for commissioning of the transformer, including prodgmeter & what so ever required.
11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 KV Horn Gap Fuse Set 3 Phase 200A
3-core XPLE, FRLS Cable 70 mm sq unarmoured
9 Mtr. Long ST Poles ST-410 SP-33 with clamps, pin, insulators, nuts bolts & concrete bottoming of concrete 0.50 cum per pole, complete earthing of each pole along with all accessories required, M.S. channels required including installation of all the accessories at the tapping point, painting, etc whatever required as per site requirement as per direction incharge engineer.
Providing, fixing installation testing & commissioning of philips/ havel make high mass security light to be fitted inside filtration plant premises with high mass GI Octagnal pole including auto transformer, connecting cable & other accessories, all carriages for complete job
Earthing of substation —Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239 GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply, laying, testing, commissioning including loading unloading transportation charges, insurance,, all carriages mech/ manual, Straightening & binding of 50 mm ACSR (0.5-acsr Rabbit) conductor including PG connection Accessories including all formalities required with electric department for check certificate & connection required formalities with PDD department as required by in charge site engineer.
Provision for branch cutting as per site requirement, along the proposed alignment of conductor. Complete Job.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_988771.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
BOQ_988771.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .