Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
20 Dec 2025, 4:00 pmClosed
DFO
CCF office, social forestry circle indore
Poly house construction and drip irrigation system construction work (including material)
2025_MPFD_465414_1
2170
Open Tender
Miscellaneous Works
Item Wise
30 days
CCF office, social forestry circle indore
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹63,000
CCF office, social forestry circle indore
29 Jan 2026
1 Dec 2025
22 Dec 2025
1 Dec 2025
20 Dec 2025
1 Dec 2025
11 Dec 2025
Polyhouse –Technical Specifications 1. Size & Shape • Size: 40 feet × 60 feet • Type: Arch-shaped polyhouse • Center Height: 15 feet • Side Height: 11 feet 2. Base / Foundation (Description) 1. Ground Preparation • The land must be excavated, filled with at least 45 cm murrum, and leveled properly. 2. Pole Foundation • Galvanized Iron (GI) pipes must be fixed in the ground using cement concrete. • Hole size for each pole: 0.45 m × 0.45 m × 0.50 m deep. • Distance between two poles should not be more than 3 meters. 3. Side Brick Wall • A small brick wall of 20 cm height and 20 cm width should be built around the entire structure. 4. Center Path • In the middle of the polyhouse, a path of interlocking pavement blocks should be made. • Path size: 17.88 m × 1.50 m. 5. Plant Beds • Beds should be built on both sides of the path. • Beds should be made using brickwork and plastered. • Beds should be placed at 90° (right angle) to the path. • Each bed: • Inner width: 1 meter • Side wall height: 20 cm • Distance between two beds: 35 cm (including sidewalls). • The gap between two bed walls should be filled with M-20 cement concrete, and plaster should be done on all brickwork. 3. Structure (Simple Description) 1. Material • Entire structure should be made from Galvanized Iron (GI) steel, hot-dip galvanized. • Structure must follow IS 875 standard and withstand 120 km/h wind speed. 2. Poles and Pipes • Main column GI pipes: 1.5 inch • Arch base GI pipes: 1.5 inch • Purlins: 1.5 inch • Remaining structure pipes: 2 inch • All GI pipes should be fixed into cement concrete in the ground. 3. Door • Aluminum frame door with 6 mm polycarbonate sheet. 4. Distance Between Columns • Maximum 3 meters. 4. Cladding (Covering Materials) 1. Poly Film • 200-micron UV-stabilized film • More than 80% light transmission • From a major/reputed brand 2. Insect Net • 40-mesh insect net on both long sides • Net height: from 1 meter above ground up to 2.5 meters • Poly film in net area should be foldable to allow airflow. 3. Shade Net • Shade-net curtains should be fixed inside the polyhouse to cover plant beds when needed. 5. Overhead Irrigation / Fogger System • Hanging foggers with lateral pipes, supporting wire, and MS support frame. • Fogger parts must be from a major/reputed brand. • 1 HP pump should be provided. • 1000-liter water tank for fogger supply.
Drip Irrigation System - The project requires the setup of two independent systems: • Site 1: Installation for 500 beds. • Site 2: Installation for 100 beds. • Scope of Work and Materials Required Your quote must cover all labor, materials, and installation for the following requirements: 1. Bed Irrigation Setup (for all 600 beds): • Bed Dimensions: 10 meters (length) x 0.15 meters (width) x 1.20 meters (height). • Drip Lines: Four parallel drip lines (10m length each) per bed. • Fittings: All necessary 16mm pipes, O-rings, take-ups, and 16mm valves connecting to the main line. 2. Underground Main Supply Line: • Pipe: 75mm diameter, 4-gauge PVC pipe. • Installation: Pipe must be installed 1 meter below ground level. • Total Length: Approximately 1053 meters of underground piping across both sites.3. Site 1 Specific Equipment (for 500 beds location): • Water Source Setup: Supply and installation of a 5000-liter water tank. • Pumping: Supply and installation of a 5 HP motor. • Filtration & Fertigation: Installation of a Screen Filter, a Sand Filter, and a Venturi injector system for fertilizer application. 4. Site 2 Specific Equipment (for 100 beds location): • Water Source Setup: Supply and installation of a 1000-liter water tank. • Pumping: Supply and installation of a 3 HP motor. • Filtration & Fertigation: Installation of a Screen Filter, a Sand Filter, and a Venturi injector system for fertilizer application.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_547169.xls
BOQ • 0.38 MB
td.pdf
Tender Documents • 5.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .