| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAdmitted-Finance | ₹9.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.9 Cr+₹2.1 L (0.21%)Admitted-Finance | ₹9.9 Cr+₹2.1 L (0.21%) | L2 | Admitted-Finance |
| 3 | L3₹10.0 Cr+₹12.1 L (1.22%)Admitted-Finance ASSAM GUWAHATI | GUWAHATI | ASSAM | ₹10.0 Cr+₹12.1 L (1.22%) | L3 | Admitted-Finance |
| 4 | L4₹10.0 Cr+₹15.3 L (1.54%)Admitted-Finance | ₹10.0 Cr+₹15.3 L (1.54%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ARIFUDDIN AHMED L1 | Sweety Infrastructure Pvt. Ltd. L2 | M/S Bright Engineer L3 | CHANDAN HALOI L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness.
(i) By Manual Means:-
A) In area of light jungle | 3.98 | Hectare | - | - | - | - |
| 2.00 | (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) | 3,645 | Cum. | - | - | - | - |
| 3.00 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( including compensation of earth.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) From private land | 22,768.2 | Cum. | - | - | - | - |
| 4.00 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) from private land | 3,479.52 | Cum. | - | - | - | - |
| 5.00 | By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 2,246.69 | Cum. | - | - | - | - |
| 6.00 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) Gr.II | 1,348.01 | Cum. | - | - | - | - |
| 7.00 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) Gr.III | 2,472.39 | Cum. | - | - | - | - |
| 8.00 | Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
B. Primer@ 1.00kg per sqm
(ii) With bitumen emulsion CSS-1h | 46,350 | Sqm. | - | - | - | - |
| 9.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(III) With Bitumen emulsion CRS-1 | 92,700 | Sqm. | - | - | - | - |
| 10.00 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 2,317.5 | Cum. | - | - | - | - |
Tender Value
₹10.0 Cr
EMD Value
₹20 L
Closing Date
5 Feb 2020, 2:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
SOPD_SIG_19_20_27 Strengthening and widening of Kamalpur to Borka (Ch. 1200m to 9200m) under Signature Project of SOPD-G (State Priority Scheme) for the year 2019-20, Kamalpur LAC
2020_PWD_15864_27
CE/DEV/TB/199/2019-20/01
Open Tender
Civil Works
Item Rate
270 days
Kamalpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Empowered Officer, ASRB A/C No. 10566991479
₹20 L
Yes
O/o the Chief Engineer, PWD (Roads), Assam
4 Sept 2020
16 Jan 2020
5 Feb 2020
16 Jan 2020
5 Feb 2020
17 Jan 2020
16 Jan 2020 - 1 Feb 2020
17 Jan 2020
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. (i) By Manual Means:- A) In area of light jungle
(Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.)
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( including compensation of earth.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) From private land
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) from private land
By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) Gr.II
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) Gr.III
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) B. Primer@ 1.00kg per sqm (ii) With bitumen emulsion CSS-1h
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (III) With Bitumen emulsion CRS-1
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Road Marker (Edge Line) : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Road Marker (Centre Line) : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance.
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) i)60cm equilateral traingle
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) ii) 60cm circular
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) 5th kilometre stone (precast)
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary Kilometer stone (Precast)
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.
Cross Drainage Works. 1m. Span RCC Slab Culvert: Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) (i) Ordinary soil A Manual Means (Depth upto 3 m) ( Without dewatering )
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I Without plasticiser B) PCC Grade M20
Plain/Reinforced cement concrete, in substructure complete as per drawing and technical specification and steel shuttering formwork. Without plasticiser E)RCC Grade M20 a)Height upto 5m Case I Using concrete Mixer
Drainage spouts complete as per drawing and Technical Specification Clause 1209.
Filler joint Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal Panther steel/ Shyam steel or equivalent)
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification
RCC Covered Drain: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, constructing of shoring and bracing, removal of slumps and other deleterious matter, dressing of sides and bottom, backfilling with approved material.) (i) Ordinary soil A Manual Means (Depth upto 3 m) ( Without dewatering )
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications
Plain/Reinforced cement concrete, in sub-structure complete as per drawing and technical specification and steel shuttering formwork.(E) RCC Grade M20 (a) Height upto 5m, Case I Using concrete Mixer
Sweety Infrastructure Pvt. Ltd.
M/S Bright Engineer
CHANDAN HALOI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.46 MB
Tendernotice_2.pdf
PDF • 4.50 MB
Tendernotice_3.pdf
PDF • 0.37 MB
BOQ_24006.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .