Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.3 LAdmitted-Finance | -24.01% | ₹27.3 L | L1 | Admitted-Finance |
| 2 | L2₹28.5 L+₹1.2 L (4.54%)Admitted-Finance | -20.56% | ₹28.5 L+₹1.2 L (4.54%) | L2 | Admitted-Finance |
| 3 | L3₹29.9 L+₹2.6 L (9.38%)Admitted-Finance TIKAMGARH | MADHYA PRADESH | 472001 | -16.88% | ₹29.9 L+₹2.6 L (9.38%) | L3 | Admitted-Finance |
| 4 | L4₹31.2 L+₹3.9 L (14.2%)Admitted-Finance | -13.21% | ₹31.2 L+₹3.9 L (14.2%) | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹71,844
Closing Date
19 Aug 2026, 6:00 pmClosed
Office of Exen watershed p.s. Jahazpur
Office of Exen watershed p.s. Jahazpur
Construction of Pakka checkdam, Talab Renovation at p.s. JAHAZPUR District Bhilwara
2026_WDSC_584344_1
02/2026-27/Jahazpur/mjsa2.2
Open Tender
Civil Works
Percentage
Jahajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, RREIS
₹71,844
Yes
10 Sept 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर] पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में@प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य] ईकाई 1 घन मी. (Nala Deepning) e'khujh dk;Z l[r feVVh esa (in Hard Soil) xzkeh.k dk;Z funsZf'kdk 2026 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr tgktiqj ds vuqlkj dz-la- 196 ¼Ck½ | 13,506.56 | cum | 54.16 | ₹7,31,515.29 |
| 2 | Nominal mix of Plain Cement Concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. The plums shall be distributed evenly and shall be not closer than 150 mm from the surface. PCC Nominal Mix 1:3:6 with Plum, Max size of Aggregate 20 mm (BSR WRD-2026 Udaipur zone, chap IX item no 11.2 C) ( In Foundation work) | 276.71 | cum | 4,036.5 | ₹11,16,939.91 |
| 3 | PCC Nominal Mix 1:2:4 with Plum, Max size of Aggregate 20 mm (BSR WRD-2026 Udaipur zone, chap IX item no 11.1 C) ( In Super Structure) | 221.02 | cum | 4,425.3 | ₹9,78,079.81 |
| 4 | Providing and Laying in position of Cement concrete Nominal mix(1:2:4) including leads of all construction materials, curing,compaction and finishing with rendering in cement sand mortar 1:3 (1cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken
stone aggregate of maximum size upto; | 31.5 | cum | 5,152.5 | ₹1,62,303.75 |
| 5 | LksUVfjax 'kVfjax ¼r[rk ,oa <qykcUnh½ dk vkj-lh-lh- Nr] Lysc] NTts] fyUVy] fLVsfuax okWy vkfn Mkyus ds fy;s yxkuk 4-5 ehVj mapkbZ rd ds fy;s rFkk gVkuk vkfn fo'ks"k fooj.k ds vuqlkj 'kVfjax LVhy | 559.41 | sqm | 346.08 | ₹1,93,600.61 |
| 6 | 15 से.मी. तक औसत मिटटी काटकर जमीन की सतह को संवारना (Dressing) तथा वनस्पती तथा छोटे पौधों को हटाना तथा तुच्छ पदार्थ और कुडा करकट को 1.5 मीटर उठान तथा 50 मीटर दूरी तक डालना। rd bsr 1b 2026 | 7,812 | cum | 10.94 | ₹85,463.28 |
| 7 | 5 ls 7 lseh xgjkbZ dk Mkxcsfyax dk;ZA (Item No. 6b) | 1,680 | rm | 1.71 | ₹2,872.8 |
| 8 | taxy dh lQkbZ] Hkkjh >kfM+;ksa rFkk 30 ls-eh- yisV rd ds ikS/kksa dks dkVus lesrA (item no.191) GKN 2026-27 | 7,812 | sqm | 2.86 | ₹22,342.32 |
| 9 | Compaction of earth or highly weathered strata . By manually or plain roller. (density 90% of Proctor).
(Item No. 18a of Irrigation BSR 2026) | 10,385.63 | cum | 18.9 | ₹1,96,288.41 |
| 10 | Watering of earth including cost of carriage of water when source of water is up to 1 km
(Item No. 28a of Irrigation BSR 2026) | 10,385.63 | cum | 9.9 | ₹1,02,817.74 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
02jahazpurbigcompressed.pdf
Tender Documents • 0.83 MB
BOQ_1037825.xls
BOQ • 0.34 MB
jahazpurcorrgendum.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .