Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹26.4 LAccepted-AOC | Ist | Accepted-AOC L1 | |
| 2 | IInd₹33.3 LRejected-AOC 0 PURE LADAI SADR PURE LADAI SULTANPUR SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | IInd | Rejected-AOC L2 |
Tender Value
₹33.3 L
EMD Value
₹35,000
Closing Date
16 Aug 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
55-ETC-I(A)/ 2022-2023
2022_UPTCL_714727_1
55-ETC-I(A)/ 2022-2023
Open Tender
Electrical Works
Item Rate
365 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
SE,ETC,PRAYAGRAJ
₹35,000
17 Dec 2022
14 Jul 2022
17 Aug 2022
14 Jul 2022
16 Aug 2022
14 Jul 2022
120 days
Amount
Annual maintenance work of following 220KV and transmission lines (57Km) and 132KV transmission lines (222.9Km) as per technical specification mentioned in tender form. Detail are given below:- 1. 220KV Unchahar-Fatehpur D/C (57Km ), 2. 132KV Fatehpur-Khaga line ( 41.8Km), 3. 132KV Fatehpur-Malwan & LILO of this line at Hussainganj line(32.6Km ), 4. 132KV Fatehpur-Malwan line (16.7Km ), 5. 132KV Khaga-Sirathu line(31.2Km ) line, 6. 132KV Malwan-Naubasta & LILO of this line at Bindaki DC line(63.0Km ), 7. 132KV Malwan-Jahanabad Line(37.6Km ) 8. 220 KV Fatehpur-Unchahar LILO at 220 KV S/S Malwan (29.1 Km.)
Quarterly routine patrolling of 220KV & 132KV Transmission line (total line length 309 Km.) and submission of its patrolling report in triplicate copy in prescribed proforma mentioning stole/missing tower parts & tower accessories tree branches falling in corridor of line, status of jumper insulators tower foundation, cooping, chimney earthing etc.
Emergency patrolling of 220 & 132KV transmission lines during tripping of line as per instruction of supervising engineer to find out the fault in line including arrangement and mobilization of gang on urgent basis.
Looping, chopping and cutting of tree branches having girth upto 0.5Mtrs. falling in the corridor of line with safety to avoid any damage to nearby crops and power/telephone line passing near vicinity of line.
Dig out from route of bamboo bushes falling under corridor of transmission line with safety to avoid any damage to nearby crops and power/telephone line passing near vicinity of line.
Fixing of tower parts/bracing with safety to avoid any damage to nearby crops and power/telephone line passing near vicinity of line. (tower parts be provided by department)
Re-fixing and tightening of dislocated/shifted vibration dampers to its place including replacement of fasteners if required in the transmission line.
Replacement of jumpers of transmission lines as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site dismantling of damaged/broken jumper from tension fitting making of new jumper of proper size and fixing of it at proper place. Cost included all T&P and labor charges but exclude the cost of jumper, fitting nut/bolt etc.
220KV Transmission line
132KV Transmission line
Replacement of damaged/broken ACSR Panther/Zebra conductor of 220& 132KV transmission line under ETD-Fatehpur as and when required job consists mobilization of gang on urgent basis, carriage of required material from store to work site, dismantling of damaged/broken conductor with disc insulator removal of complete/damaged conductor jointing of new conductor of proper length stringing of conductor at its place with suitable sag with all other work to complete the job satisfactory cost includes all men T&P but exclude the cost of conductor fittings disc insulators etc.
220KV Transmission line
132KV Transmission line
Replacement of damaged/broken disc insulator of transmission line under ETD- Fatehpur as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site dismantling of damaged/broken disc insulator from tower removal of complete/damaged disc insulator making new disc insulator string with proper number of disc insulators. Then hoisting of disc insulator string at its proper place with conductor. Cost includes all men T&P but exclude the cost of disc insulators fitting etc.
220KV Transmission line
132KV Transmission line
Replacement of damaged/broken earth wire/OPG of transmission line under ETD- Fatehpur as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site, dismantling of damaged/broken earth wire removal of complete/damaged earth wire jointing of new earth wire with proper size stringing of same earth wire at its proper place with proper sag. This work also include splicing of OPG at broken place. Cost includes all men T&P but exclude the cost of earth wire fittings etc.
220 KV & 132KV Transmission line
Tightening of nut and bolt of all jumpers as per requirement of transmission lines under ETD-Fatehpur. Job consists replacement of nuts & bolts at both side of jumper, if found melted. Cost includes all men, T&P but exclude the cost of nut/bolt etc.
220KV Transmission line No. of jumper
132KV Transmission line No. of jumper
Making of cooping by proper cleaning of stub with hardwire brush etc to remove complete dust & rust from the rusted surface. Painting of leg with black paint and then making of cooping of proper size on chimney with 1:4 ratio of cement and sand with proper curing for 7days and all other associated works to complete the job satisfactorily including cost of all material, labour and T&P etc.
220KV Transmission line No. of cooping
132KV Transmission line No. of cooping
Height rising of chimney which is below the ground level to avoid rust formation of stub due to contact of soil. Work includes breaking of copping, chipping and cleaning of top surface for proper adhesiveness and cleaning of stub with hardwire brush to remove complete rust and dust from the surface of stub and then painting of rusted portion with zinc rich primer paint and then making of chimney with 1:2:4 ratio of cement sand and stone ballast around 50cm. in height from its initial height to avoid rust formation due to contact of soil. Making of cooping of proper size on chimney. Proper curing for 7 days and all other associated work to complete the job satisfactorily. Rates include the cost of labor, T&P and material i.e.; cement, concrete, sand paint and required shuttering shall be arranged by contractor at his own cost.
220KV Transmission line No. of chimney
132KV Transmission line No. of chimney
Repairing of badly rusted legs by breaking of chimney at least 700mm. depth. Proper cleaning of stub with hardwire brush etc to remove rust and dust from the surface of stub and then making holes in the stubs and fixing of additional galvanized angle of at least 1000mm. long with nuts and bolts and then electrical welding with stub in a length of 200mm. interval and then increasing the height of chimney around ½ feet from its initial height to avoid rust formation due to storage of water with 1:2:4 ratio of cement, concrete and sand (Rate includes the cost of all material i.e; cement, concrete, sand, paint Galv angles & nuts, bolts).
Tack welding of all the bolts up to the height of one section of tower or 5meter from ground level whichever is higher & application of Zinc rich Aluminum paint on the affected surface including cost of all material and T&P etc.
Backfilling of soil around the tower leg including all earth work, back filling, ramming and leveling etc. including the cost of borrowed earth if required.
E-VISION INFRATECH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .