Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹4.5 L
Closing Date
21 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE/TPSO/MDU
O/oCE/TPSO/MDU
Civil work for Kumaralingapuram 110 KV SS
2026_EB_711712_1
CE/TPSO/MDU/008/26-27
Open Tender
Civil Works
Works
180 days
Kumaralingapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.5 L
Yes
7 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | 232 | m3 | - | - |
| 2 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete. | 21 | m3 | - | - |
| 3 | PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete. | 33 | m3 | - | - |
| 4 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For footing concrete. | 16 | m3 | - | - |
| 5 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. | 21 | m3 | - | - |
| 6 | Refilling the foundation and basement with excavated earth including ramming as per specification , cost of all materials lead and lift etc. complete. | 141 | m3 | - | - |
| 7 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete at Existing Ground level | 33 | m3 | - | - |
| 8 | Supplying and filling of gravel above grade beam all cost of materials, lead, lift, labour etc., complete. | 345 | m3 | - | - |
| 9 | RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) for plinth beam with form work including cost of cement all labour, materials, lead, lift etc. complete. | 7 | m3 | - | - |
| 10 | Providing PCC 1:3:6 using 20mm metal 100 mm thick graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC. | 22 | m3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_855029.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .