| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.9 CrAccepted-AOC | ₹13.9 Cr Quoted ₹14.4 Cr | L-1 | Accepted-AOC Tender Accepted |
| 2 | L-2₹14.7 CrRejected-Finance | ₹14.7 Cr | L-2 | Rejected-Finance Being Higher Rate |
| 3 | L-3₹15.1 CrRejected-Finance | ₹15.1 Cr | L-3 | Rejected-Finance Being Higher Rate |
| 4 | L-4₹15.4 CrRejected-Finance | ₹15.4 Cr | L-4 | Rejected-Finance Being Higher Rate |
| 5 | L-5₹16.1 CrRejected-Finance VILL SIDHIYAWA JAGDISHPUR AMETHI UP 227817 | JAGDISHPUR | AMETHI | UTTAR PRADESH | 227817 | ₹16.1 Cr | L-5 | Rejected-Finance Being Higher Rate |
Tender Value
₹22.5 Cr
EMD Value
₹33.7 L
Closing Date
27 Mar 2025, 12:00 pmClosed
SE Unnao Circle Unnao
SE Unnao Circle Unnao
Widening of Strengthening of Sandila Chakalwanshi Bithoor Chaubepur Road SH166 KM31 to 38 in district Unnao with 05 Year Maintenance
2025_CEUCZ_1020125_1
614/MT/1MT/E-Tender/UC/24-25 Date 31-01-2025
Open Tender
Civil Works - Roads
450 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹33.7 L
Yes
SE Unnao Circle Unnao
29 Jul 2025
21 Mar 2025
27 Mar 2025
21 Mar 2025
27 Mar 2025
21 Mar 2025
21 Mar 2025
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. I/C Labour Cess but Excluding GST
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m I/C Labour Cess but Excluding GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.I/C Labour Cess but Excluding GST
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.I/C Labour Cess but Excluding GST
Providing, laying, spreading and compacting graded stone aggregate, Cement @ 1%, Bitumen Emulsion @ 3.5% to wet mix macadam specification including premixing the Material with water & Cement at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with Paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.I/C Labour Cess but Excluding GST
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. I/C Labour Cess but Excluding GST
Providing and applying tack coat with bitumen on Bitumenous Surface using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.I/C Labour Cess but Excluding GST
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.I/C Labour Cess but Excluding GST
Construction of Shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. I/C Labour Cess but Excluding GST.
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.I/C Labour Cess but Excluding GST.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.I/C Labour Cess but Excluding GST.
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations ..I/C Labour Cess but Excluding GST.
Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200) .I/C Labour Cess but Excluding GST.
Providing and laying reinforced cement concrete M 25 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5. I/C Labour Cess but Excluding GST.
Providing and laying reinforced cement concrete M 25 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (Wearing Coat). I/C Labour Cess but Excluding GST.
Mild steel or iron in plain work such as in reinforced concrete / brick work (when not included in overall rates) wrought to required shape as necessary I/C bending for proper completion of the work and including supply of steel, it's wastage and hooks and authorized over lapping shall be measured. I/C Labour Cess but Excluding GST.
Stuck pointing with cement and fine sand of 1.25 fineness modulus morter on stone work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.
Filling Coarse Sand between road and abutment. I/C Labour Cess but Excluding GST.
Filling Of Fine Sand in Bogi Action Places. I/C Labour Cess but Excluding GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.I/C Labour Cess but Excluding GST.
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets.I/C Labour Cess but Excluding GST.
First Class brick on edge flooring laid dry joints sand filled including preparation of base to proper slope and its ramming and including supply of all materials, labour & T&P etc, required for proper completion of the work.AS Per SoR Item No-615. I/C Labour Cess but Excluding GST.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Extention of Culvert) .I/C Labour Cess but Excluding GST.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(Extention of Culvert) I/C Labour Cess but Excluding GST.
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 1000 mm dia(Extention of Culvert) I/C Labour Cess but Excluding GST.
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Extention of Culvert) I/C Labour Cess but Excluding GST.
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4(Extention of Culvert) I/C Labour Cess but Excluding GST.
Plastering with cement mortar (1:4) 12 mm thick on brickwork in substructure/superstracutre as per technical specification clauses 613.4 & 1204 (Extention of Culvert) I/C Labour Cess but Excluding GST.
Maintenance Cost for 5 Years from the Actual Date of Complition. Ist Year Mantenance Amount will be Zero II nd Year @ 0.25%
III rd Year @ 0.50%
IV th Year @ 0.75%
V th Year @ 1.00%
Sanjay Bajpai (BID ID -5069275)
M/S Maa Vaishnoo Infra Venture Pvt Ltd (BID ID -5083811)
M/s Raj Laxmi Enterprises (BID ID -5083387)
M/S DEEPAK KUMAR AGARWAL (BID ID -5083672)
PBC INFRASTRUCTURE INDIA PVT LTD (BID ID -5083774)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid